Loading...
ISSN 2096-4498
CN 44-1745/U
Home
Solicit Contributions
Writing Requirements
Editorial Board
Council Members
Publication Ethics
Open Access
Advertising
Contact Us
中文
Current Issue
2018, 38 (4) Published: 20 April 2018
Previous Issue
Next Issue
Back issue
我国硬岩掘进机的创新与实践
洪开荣, 王杜鹃, 郭如军
2018, 38(4): 519-537
DOI:
10.3973/j.issn.2096-4498.2018.04.001
Abstract
(
2757
)
PDF
(4514KB) (
1774
)
智慧公路隧道协同管理研究
韩直, 关菲菲
2018, 38(4): 538-544
DOI:
10.3973/j.issn.2096-4498.2018.04.002
Abstract
(
1456
)
PDF
(1713KB) (
1618
)
Research on Settlement Mechanism of Primary Support of Soft Rock Tunnel and Its Countermeasures
YANG Jianmin, SHU Dongli, ZHANG Han, ZHU Linchen
2018, 38(4): 545-550
DOI:
10.3973/j.issn.2096-4498.2018.04.003
Abstract
(
1062
)
PDF
(1918KB) (
967
)
Study of Personnel Evacuation Mode of Mawan Undersea Shield Tunnel
ZENG Yanhua, LI Jie, PENG Kangfu, HAN Tong, ZHANG Xianfu
2018, 38(4): 551-557
DOI:
10.3973/j.issn.2096-4498.2018.04.004
Abstract
(
969
)
PDF
(2527KB) (
716
)
Analysis of Various Influencing Factors on Highway Tunnel Dimming and Discussion on Dimming Control in Eastern Zhejiang Area
QIAN Dengchao, KANG Cheng, TONG Mengsheng, ZHANG Tianhang, ZHANG Chi, CHEN Liang, WU Ke
2018, 38(4): 558-563
DOI:
10.3973/j.issn.2096-4498.2018.04.005
Abstract
(
1056
)
PDF
(1824KB) (
663
)
Statistics on Traffic Accidents Occurred in Operating Highway Tunnels in China and Their Casualties Evaluation
SHEN Yanjun, YANG Yang, ZOU Xiaolong, WANG Yongzhi, HOU Xin, ZHANG Huan
2018, 38(4): 564-574
DOI:
10.3973/j.issn.2096-4498.2018.04.006
Abstract
(
1450
)
PDF
(1476KB) (
3017
)
Research Progress of Passive Failure of Excavation Face during Slurry Shield Tunneling
MIN Fanlu, SONG Hangbiao, BAI Yuxin, YAO Zhanhu
2018, 38(4): 575-581
DOI:
10.3973/j.issn.2096-4498.2018.04.007
Abstract
(
1467
)
PDF
(1340KB) (
907
)
Study of Carbonization Depth of Concrete under Low Humidity Condition in Northern Shaanxi Area and Its influencing Factors
ZHANG Libo, ZHANG Xiaozhen, ZHANG Ranran
2018, 38(4): 582-587
DOI:
10.3973/j.issn.2096-4498.2018.04.008
Abstract
(
998
)
PDF
(1091KB) (
753
)
Analysis of Vibration Response and Cavity Effect of Blasting Construction of Tunnel in SoilRock Interlaced Strata
LI Zhitang, YIN Rongshen, MENG Yafeng, DENG Weihua, CHEN Lanjiang
2018, 38(4): 588-593
DOI:
10.3973/j.issn.2096-4498.2018.04.009
Abstract
(
961
)
PDF
(2013KB) (
740
)
Study of Influence of Construction of Large Crosssection Rectangular EPBtype Pipe Jacking Tunnel on Below Operating Metro Tunnel Deformation
YI Dan, YAN Detian, DANG Jun
2018, 38(4): 594-602
DOI:
10.3973/j.issn.2096-4498.2018.04.010
Abstract
(
1128
)
PDF
(4307KB) (
781
)
Numerical Analysis of Waterproof Mechanism of Shield Tunnel Joint Based on Applied Water Pressure
SUN Lianwei
2018, 38(4): 603-610
DOI:
10.3973/j.issn.2096-4498.2018.04.011
Abstract
(
1090
)
PDF
(3033KB) (
548
)
Study of Distribution of Transverse Foundation Stiffness of Immersed Tunnel
GAN Pengshan, ZHAO Guohu, YUAN Yong, FU Baiyong
2018, 38(4): 611-618
DOI:
10.3973/j.issn.2096-4498.2018.04.012
Abstract
(
975
)
PDF
(1830KB) (
627
)
Study of Determination Method for Slurry Pressure on Excavation Face of Superlarge Slurry Shield Tunnel in Composite Ground
CHEN Jiakang, LIU Shannan, XIAO Xiaochun, WU Jun, LI Lei, WANG Lei
2018, 38(4): 619-626
DOI:
10.3973/j.issn.2096-4498.2018.04.013
Abstract
(
1153
)
PDF
(2082KB) (
916
)
深圳至中山跨江通道工程总体设计
徐国平, 黄清飞
2018, 38(4): 627-639
DOI:
10.3973/j.issn.2096-4498.2018.04.014
Abstract
(
1438
)
PDF
(10046KB) (
2339
)
Dismantling and Enlarging Technology for Ridge Core Section of Muzhailing Tunnel on LanzhouChongqing Railway
YE Kangkai
2018, 38(4): 640-648
DOI:
10.3973/j.issn.2096-4498.2018.04.015
Abstract
(
1157
)
PDF
(3419KB) (
855
)
Analysis of Key Technological Improvement in Construction of Metro Station by CutandCover TopDown Method
YANG Xianghua, LEI Bo, HUANG Zhe
2018, 38(4): 649-655
DOI:
10.3973/j.issn.2096-4498.2018.04.016
Abstract
(
1036
)
PDF
(3123KB) (
924
)
Maintenance and Reinforcement of Operating Municipal Utility Tunnel
SONG Chaoye, JIN Ruohong, WANG Rongrong
2018, 38(4): 667-673
DOI:
10.3973/j.issn.2096-4498.2018.04.018
Abstract
(
929
)
PDF
(1585KB) (
961
)
Engineering Practice of Clearing of Anchor Rope Intruding into Shield Tunnel by Adding Vertical Shaft and Mined Gallery
QIN Han
2018, 38(4): 674-682
DOI:
10.3973/j.issn.2096-4498.2018.04.019
Abstract
(
955
)
PDF
(4840KB) (
641
)
Stateofart and Risk Management of Shield Chamber Opening Technology
YU Baomin, JI Yuguo
2018, 38(4): 683-693
DOI:
10.3973/j.issn.2096-4498.2018.04.020
Abstract
(
1161
)
PDF
(3143KB) (
815
)
Application of Internetbased Condition Monitoring Technology to Maintenance of Shield
CHEN Wenyuan, ZHANG Jihong, ZHANG Ganghong, ZHAO Po, TIAN Shuiqing
2018, 38(4): 694-698
DOI:
10.3973/j.issn.2096-4498.2018.04.021
Abstract
(
1596
)
PDF
(1823KB) (
681
)
Discussion on Applicability of Doubleboom Underground Excavation Trolley to Soil Metro Tunnel
HONG Peng, ZHAO Sheng, AN Sanqian
2018, 38(4): 699-708
DOI:
10.3973/j.issn.2096-4498.2018.04.022
Abstract
(
1664
)
PDF
(3941KB) (
1211
)
Research and Development of Shield/TBMdedicated Vibration Monitoring Sensor VMBOX
XIN Shujie, ZHOU Yuanhang, ZHANG Meng, LI Lei
2018, 38(4): 709-714
DOI:
10.3973/j.issn.2096-4498.2018.04.023
Abstract
(
999
)
PDF
(1459KB) (
1002
)
国内最大直径盾构隧道——春风隧道
游永锋
2018, 38(4): 715-717
Abstract
(
988
)
PDF
(3432KB) (
1679
)
Online System
Submit a paper
Peer review
Editor center
Chief editor center
WeChat