Loading...
ISSN 2096-4498
CN 44-1745/U
Home
Solicit Contributions
Writing Requirements
Editorial Board
Council Members
Publication Ethics
Open Access
Advertising
Contact Us
中文
Current Issue
2020, 40 (1) Published: 20 January 2020
Previous Issue
Next Issue
Back issue
Application of Artificial Intelligence Science to Construction Deformation Prediction and Control of Underground Engineering in Soft Soil: Cases Study on Theoretical Foundation, Method Application and Fine Intelligent Technical Management
SUN Jun, WEN Haiyang
2020, 40(1): 1-8
DOI:
10.3973/j.issn.2096-4498.2020.01.001
Abstract
(
626
)
PDF
(2249KB) (
820
)
Fullscale Experimental Study on Structural Mechanism of TconnectedTunnel Constructed by Shield Method
ZHU Yaohong, GAO Yimin, DONG Zibo, LIU Xian
2020, 40(1): 9-18
DOI:
10.3973/j.issn.2096-4498.2020.01.002
Abstract
(
372
)
PDF
(3091KB) (
283
)
(1. Shanghai Tongyan Civil Engineering Technology Corp., Ltd., Shanghai 200092, China; 2. Civil Engineering Information Technology Research Center, Ministry of Education, Tongji University, Shanghai 200092, China; 3. College of Civil Engineering, Tongji University, Shanghai 200092, China; 4. Shanghai Underground Infrastructure Safety Testing and Maintenance Equipment Engineering Technology Research Center, Shanghai 200092, China)
SANG Yunlong, LIU Xuezeng, ZHANG Qiang
2020, 40(1): 19-27
DOI:
10.3973/j.issn.2096-4498.2020.01.003
Abstract
(
457
)
PDF
(5944KB) (
369
)
Field Experimental Study on T-connected Tunnel with Pipe Jacking Method
DING Jianmin, DONG Zibo, MO Zhenze, JIN Yongfu, DING Jian, WANG Nailong
2020, 40(1): 28-34
DOI:
10.3973/j.issn.2096-4498.2020.01.004
Abstract
(
350
)
PDF
(4231KB) (
227
)
Laboratory Test of Reinforced Concrete Pile Foundation Cutting by Shield Cutterhead
XU Huaguo, CHEN Kui, SUN Zhenchuan
2020, 40(1): 35-42
DOI:
10.3973/j.issn.2096-4498.2020.01.005
Abstract
(
350
)
PDF
(5485KB) (
201
)
Experimental Study on AttitudeInterlock Control Technology of Pipecurtain Group with Inner Interlock Joints
XIN Zhenggang
2020, 40(1): 43-49
DOI:
10.3973/j.issn.2096-4498.2020.01.006
Abstract
(
306
)
PDF
(2187KB) (
245
)
Deformation Control Standards of High-speed Railway Tunnel in Loess by There-bench Method Based on Monitoring Data
FENG Jimeng, ZENG Sicong, LIU Aiwu, ZHAHG Shufa, ZHANG Junru
2020, 40(1): 50-57
DOI:
10.3973/j.issn.2096-4498.2020.01.007
Abstract
(
325
)
PDF
(2395KB) (
266
)
Analysis of Transportation Network of Underground Logistics System in Container Port Area under Background of Carbon Trading
SUN Feifei, LIANG Chengji, HU Xiaoyuan
2020, 40(1): 58-65
DOI:
10.3973/j.issn.2096-4498.2020.01.008
Abstract
(
301
)
PDF
(1450KB) (
311
)
Analytical Solution of Longitudinal Deformation of Existing Shield Tunnel Induced by Surface Surcharge
ZHANG Yong, MA Jinrong, TAO Xiangling, LI Yang
2020, 40(1): 66-73
DOI:
10.3973/j.issn.2096-4498.2020.01.009
Abstract
(
276
)
PDF
(3054KB) (
253
)
Discussion on Some Issues in Prevention and Treatment Design for Tunnel Crossing Debris Flow Gully
LIAO Jun, XIAO Bo, WANG Daoliang, SHI Bo
2020, 40(1): 75-82
DOI:
10.3973/j.issn.2096-4498.2020.01.010
Abstract
(
264
)
PDF
(2201KB) (
289
)
New Construction Technology of One-time Blasting Excavation of Micro-bench with Invert for Single-track Railway Tunnels
YANG Jiasong
2020, 40(1): 83-89
DOI:
10.3973/j.issn.2096-4498.2020.01.011
Abstract
(
393
)
PDF
(1380KB) (
744
)
Application of Double Primary Support to High Geostress Soft Rock Section of Yuntunbao Tunnel
ZHONG Youjiang, LIU Shijie, WU Jianhe
2020, 40(1): 90-98
DOI:
10.3973/j.issn.2096-4498.2020.01.012
Abstract
(
372
)
PDF
(3932KB) (
536
)
Comparison between Rock-drilling Jumbo and Manual Drilling-and-Blasting of Railway Tunnel
JIN Ming, WANG Minghui, ZHU Jianguo, LIU Dalin, ZHANG Qiao
2020, 40(1): 99-105
DOI:
10.3973/j.issn.2096-4498.2020.01.013
Abstract
(
359
)
PDF
(2913KB) (
947
)
Ground Deformation Characteristics of Water-rich Gravel Stratum during EPB Shield Stop
LI Zhijun, FANG Youliang, XIAO Gang, LAI Wenhui, QU Yong, FU Jinyang, XU Zan
2020, 40(1): 106-113
DOI:
10.3973/j.issn.2096-4498.2020.01.014
Abstract
(
262
)
PDF
(2148KB) (
276
)
Application of Inclinometer Technology of Fiber Optic Gyroscope with Near-Horizontal Freezing Hole
JIANG Guojing, LI Fangzheng, ZHOU Xiaomin
2020, 40(1): 114-119
DOI:
10.3973/j.issn.2096-4498.2020.01.015
Abstract
(
300
)
PDF
(1160KB) (
465
)
Research on Positioning Accuracy and Calibration of Working Jumbo Boom Ends in Tunnel Operation
KANG Yanjun
2020, 40(1): 120-125
DOI:
10.3973/j.issn.2096-4498.2020.01.016
Abstract
(
245
)
PDF
(2158KB) (
325
)
Parameters Control Method for Thrust System of Super-large Diameter Shield Boring in Soft Soil Layer of Sea Area: a Case Study o f Shantou Bay Tunnel Project
CHEN Qiao, SUN Zhenchuan, ZHANG Bing, WANG Chaofeng, YANG Jiangxiao, WANG Famin
2020, 40(1): 126-133
DOI:
10.3973/j.issn.2096-4498.2020.01.017
Abstract
(
404
)
PDF
(2411KB) (
586
)
Sealing Device for Launching and Receiving of Tunneling Machine for Connection Gallery with Mechanical Excavation Method
WANG Kun, YE Lei, CHENG Yonglong, GAO Wenliang, ZHANG Shuqi, ZHENG Liangkui
2020, 40(1): 134-142
DOI:
10.3973/j.issn.2096-4498.2020.01.018
Abstract
(
294
)
PDF
(5086KB) (
308
)
深中通道工程关键技术及挑战
宋神友, 陈伟乐, 金文良, 夏丰勇, 付佰勇
2020, 40(1): 143-152
DOI:
10.3973/j.issn.2096-4498.2020.01.019
Abstract
(
667
)
PDF
(9309KB) (
2188
)
Online System
Submit a paper
Peer review
Editor center
Chief editor center
WeChat