新型带压浇筑隧道数字化衬砌台车研究与应用

姬海东, 刘在政, 张海涛   

  1. (中国铁建重工集团有限公司, 湖南 长沙 410100)
  • 收稿日期:2018-04-18 修回日期:2018-07-16 出版日期:2018-08-20 发布日期:2018-09-04
  • 作者简介:姬海东(1976—),男,湖南长沙人,1999年毕业于长沙铁道学院,交通土建专业,本科,高级工程师,从事隧道工法研究工作。Email: jhd1007@163.com。
  • 基金资助:

    中国铁路总公司科技研究开发计划课题(2017G007-H)

Research and Application of A New Type of Digital  Tunnel Lining Trolley with Pressured Casting

JI Haidong, LIU Zaizheng, ZHANG Haitao   

  1. (China Railway Construction Heavy Industry Co., Ltd., Changsha 410100, Hunan, China)
  • Received:2018-04-18 Revised:2018-07-16 Online:2018-08-20 Published:2018-09-04

摘要:

为解决传统衬砌台车在隧道衬砌施工中存在的跑模、振捣强度大、搭接部易损坏等问题,以及减少衬砌空洞、裂缝、掉块等病害,通过引进装备设计和信息化设计的理念,结合传统施工工艺,研制了一款可带压浇筑的新型隧道数字化衬砌台车。该台车具有双浇筑技术、带压入模技术、高频振捣技术、软搭接技术以及数字化控制技术,并已在湖北罗家山隧道进行初次使用,取得了良好的施工效果。双浇筑系统将混凝土浇筑时间由12 h缩短至8 h,高频振捣使混凝土充分捣固,气泡数量明显减少,有效地解决了衬砌质量问题,降低了人员劳动强度。同时,信息集成传输系统的应用,一定程度上实现了衬砌施工的机械化、信息化和智能化。

关键词: 隧道, 数字化衬砌台车, 带压浇筑, 高频振捣, 浇筑系统, 控制系统, 软搭接

Abstract:

The construction of tunnel lining by traditional lining trolley has many disadvantages such as concrete leakage, large vibration intensity and easy damage of connection point, etc. Hence, a new type of digital tunnel lining trolley with pressured casting is developed based on equipment design and informatized design to reduce lining hollows, cracks and drops. The trolley is equipped with doublecasting technology, pressintomold technology, highfrequency vibrating technology, connecting by special elastic material (soft connection technology), and digital control technology. The trolley has been applied firstly to Luojiashan Tunnel in Hubei, and good effects have been achieved. The doublecasting system can reduce the casting time from 12 h to 8 h, and the highfrequency vibrating can tamp concrete fully and reduce the bubbles, which can improve the concrete quality and reduce the labor intensity. Meanwhile, the mechanization, informatization and intellectualization of lining construction have been realized to a certain extent by the application of information integrated transmission system.

Key words: tunnel, digital lining trolley, pressured casting, highfrequency vibrating, casting system, control system, connecting by special elastic material (soft connection)

中图分类号: