ISSN 2096-4498 CN 44-1745/U
隧道建设(中英文) ›› 2007, Vol. 27 ›› Issue (2): 72-74.DOI: B
• 施工技术 • 上一篇 下一篇
范雄娃
收稿日期:
修回日期:
出版日期:
发布日期:
作者简介:
FAN Xiong-Gui
Received:
Revised:
Online:
Published:
摘要:
结合广砚高速公路工程实例,较为详细地介绍运用预应力锚索框格梁加固路堑边坡的施工方法,并对施工设备和锚索材料的选择、工艺流程及施工注意事项和质量控制措施等进行了一些探讨。
关键词:  , 预应力锚索锚索张拉, 路堑边坡施工工艺
Abstract:
Taking Guangyan highway as project case, the paper presents in detail the construction methods for the consolidation of the road channel side slopes by means of prestressed anchoring cables and concrete frames. The paper also probes into the selection of the construction machinery and raw materials for the anchoring cables, the construction processes, items to which special attention should be paid during construction and quality control measures.
中图分类号:
U418.5+2
范雄娃. 预应力锚索框架加固路堑边坡施工技术[J]. 隧道建设, 2007, 27(2): 72-74.
FAN Xiong-Gui. Construction Technology for Consolidation of Road Channel Side Slopes by means of Prestressed Anchoring Cables and Concrete Frames[J]. Tunnel Construction, 2007, 27(2): 72-74.
0 / / 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: http://www.suidaojs.com/CN/B
http://www.suidaojs.com/CN/Y2007/V27/I2/72