对龙厦铁路象山隧道岩溶地段工程和水文地质情况做了简要说明,以YDK24+114~+144段的注浆循环为例,在注浆参数、材料选用、注浆顺序、施工工艺、机具设备配置以及注浆效果评定等方面,对岩溶地段全断面超前注浆加固技术做了介绍,为今后类似工程积累了经验。
关键词: 岩溶隧道, 全断面注浆, 材料应用, 加固技术, 堵水
Abstract:
The engineering geology and hydrogeology of the karst section of Xiangshan tunnel on LongyanXiamen railway is presented. The fullface advance grouting technology for karst area, including grouting parameters, grouting materials, grouting procedure, grouting technique, grouting equipment and grouting effect assessment, are described, with the grouting in YDK24+114~+144 section of Xiangshan tunnel as an example. This paper can provide reference for similar projects in the future.
Key words: karst tunnel, fullface grouting, grouting material, reinforcement technology, water sealing
中图分类号:
U 455.41+2
韩志怀. 象山隧道岩溶地段全断面超前注浆堵水与加固技术[J]. 隧道建设, 2009, 29(5): 558-562.
HAN Zhi-Huai. Fullface Advance Grouting for Water Sealing and Reinforcement of Karst Section of Xiangshan Tunnel[J]. Tunnel Construction, 2009, 29(5): 558-562.