隧道建设(中英文) ›› 2010, Vol. 30 ›› Issue (4): 465-468.

• 施工技术 • 上一篇    下一篇

括苍山隧道二号通风竖井正向施工导碴井、二次扩挖法施工技术

吴乐   

  1. 中国中铁隧道股份有限公司甘肃引洮供水项目部, 甘肃 定西748212
  • 收稿日期:2010-04-19 修回日期:2010-07-13 出版日期:2010-08-27 发布日期:2010-08-30
  • 作者简介:吴乐(1985—),男,新疆鄯善人,2006年毕业于长安大学公路工程专业,助理工程师,现主要从事隧道工程施工及管理工作。

Application of “Muck Dropping Shaft Sinking and Secondary Enlarging
Excavation” Technology in Construction of No.2
Venlitation Shaft of Kuocangshan Tunnel

TUN  Le   

  1. Tao River Water Diversion Headquarters of China Railway Tunnel Stock Co., Ltd., Dingxi 748212, Gansu, China
  • Received:2010-04-19 Revised:2010-07-13 Online:2010-08-27 Published:2010-08-30

摘要:

No. 2 ventilation shaft of Kuocangshan tunnel on ZhujiYongjia expressway has complex geologic condition, many construction difficulties and short construction schedule. In order to complete the project on time, the construction technology of "muck dropping shaft sinking and secondary enlarging excavation" is selected for the sinking of the shaft from several shaft sinking methods, including conventional onetime shaft sinking method, "muck dropping shaft sinking and secondary enlarging excavation" method and raise boring method. The selected construction technology is presented in this paper. This technology not only achieves good results in construction schedule, construction safety and construction quality, but also reduces the construction cost.

关键词: tunnel, ventilation shaft, muck dropping shaft sinking, secondary enlarging excavation

Abstract:

No. 2 ventilation shaft of Kuocangshan tunnel on ZhujiYongjia expressway has complex geologic condition, many construction difficulties and short construction schedule. In order to complete the project on time, the construction technology of "muck dropping shaft sinking and secondary enlarging excavation" is selected for the sinking of the shaft from several shaft sinking methods, including conventional onetime shaft sinking method, "muck dropping shaft sinking and secondary enlarging excavation" method and raise boring method. The selected construction technology is presented in this paper. This technology not only achieves good results in construction schedule, construction safety and construction quality, but also reduces the construction cost.