大跨分岔式隧道结构设计关键技术研究

毕强,吴金刚   

  1. (北京市市政工程设计研究总院, 北京 100082)
  • 收稿日期:2011-09-26 修回日期:2011-11-01 出版日期:2011-12-20 发布日期:2012-01-11

Study on Key Technologies for Structural Design of Largespan Forked Tunnel

BI Qiang, WU Jingang   

  1. (Beijing General Municipal Engineering Design and Research Institute, Beijing 100082, China)
  • Received:2011-09-26 Revised:2011-11-01 Online:2011-12-20 Published:2012-01-11
  • About author:毕强(1979—),男,北京人,2002年毕业于北京建筑工程学院交通土建专业,本科,工程师,主要从事隧道与地下工程设计及研究方面的工作。

摘要: 以深圳市东部过境高速公路莲塘隧道〖JP3〗为工程背景,对大跨分岔式隧道结构设计中的关键技术进行研究。通过有限元计算,对“2+2车道”和“2+3车道”分岔的断面形式,连拱段结构设置的必要性,钢支撑的选型以及系统锚杆的布设方案进行分析和对比。主要结论: 1)在满足交通功能的前提下,应尽量选取“2+2车道”的设计形式; 2)小净距段隧道受力状态及施工工法前后转换方面均较连拱段有优势,建议取消连拱段; 3)大跨分岔式隧道分岔部一般设置在隧道工程地质较好地段,以方便大跨分岔结构的实施,如莲塘隧道将分岔部设置在Ⅲ级围岩段,而对于开挖跨度接近30m的大跨段,初期支护一般应设置钢格栅,此时应优先选用“钢筋格栅+喷锚”的初期支护形式; 4)莲塘隧道分岔部位于Ⅲ级围岩段,系统锚杆设计长度以5m为宜,应于拱部、侧墙均匀布设。

关键词: 大跨分岔式隧道, 结构设计, 连拱隧道, 钢支撑, 锚杆

Abstract: The key technologies for the structural design of largespan forked tunnel are studied, with Liantang tunnel on East Transit Highway in Shenzhen as an example. The crosssection modes of the forked tunnel, the necessity to arrange the doublearch section, the selection of steel support types and the layout of the systematic anchor bolts are analyzed by means of finite element calculation. Conclusions drawn are as follows: 1) Crosssection of “2+2 driveway” mode shall be adopted as far as possible, provided that the traffic requirements can be satisfied; 2) Smallspaced tunnel is superior to doublearch tunnel in terms of the stress conditions and the transition among the construction methods, therefore it is suggested that the doublearch tunnel section should be cancelled; 3) The forked section of largespan forked tunnel is usually arranged at positions with good geological conditions, so as to facilitate the construction of the largespan forked structure. The forked section of Liantang tunnel is arranged at the position with Grade Ⅲ rock mass. For tunnel sections with the excavation span being close to 30m, the primary support consisting of rebar lattice girder, shotcreting and bolting shall be preferred. 4) The forked section of Liantang tunnel is located in Grade Ⅲ rock mass, therefore the systematic anchor bolts should be 5m long and should be installed uniformly on the arch and side walls.

Key words: largespan forked tunnel, structural design, doublearch tunnel, steel support, anchor bolt