隧道建设(中英文) ›› 2016, Vol. 36 ›› Issue (5): 544-548.DOI: 10.3973/j.issn.1672-741X.2016.05.008

• 研究与探索 • 上一篇    下一篇

地铁车站盾构井处临时环梁计算优化分析

高涛1, 赵芮2   

  1. (1. 黄河勘测规划设计有限公司, 河南 郑州 450003;  2. 河南省商丘市水利建筑勘测设计院, 河南 商丘 476000)
  • 收稿日期:2015-11-09 修回日期:2016-02-19 出版日期:2016-05-20 发布日期:2016-05-25
  • 作者简介:高涛(1984—),男,河南郑州人,2009年毕业于华北水利水电学院,水工结构工程专业,硕士,工程师,现从事地下结构工程、城市轨道与铁道工程方面的工作。Email: 271880820@qq.com。

Optimization Analysis of Calculation of Temporary Ring  Beam for Shield Hoisting Shaft of Metro Station

GAO Tao1, ZHAO Rui2   

  1. (1. Yellow River Engineering Consulting Co., Ltd., Zhengzhou 450003, Henan, China;  2. Shangqiu Water Conservancy Construction Survey Design Institute, Shangqiu 476000, Henan, China)
  • Received:2015-11-09 Revised:2016-02-19 Online:2016-05-20 Published:2016-05-25

摘要:

盾构井在盾构吊装期间,侧向压力主要由临时环梁承担,开孔周边受力情况较为复杂。本文通过对地铁车站盾构井处临时环梁进行三维建模计算,并与传统二维计算结果进行对比,得出如下结论: 1)二维计算存在局部弯矩过大及配筋过于保守等缺点,有一定的优化余地; 2)相对于二维计算,三维整体建模计算结果更加合理,得出的结构尺寸及配筋结果对于类似工程具有一定的参考意义。

关键词: 地铁车站, 盾构井, 临时环梁, SAP2000, 有限元, 三维整体计算, 二维计算

Abstract:

During the shield hoisting, the lateral pressure is mainly borne by the temporary ring beam; meanwhile, the stresses of surrounding soil are complicated. A threedimensional model of temporary ring beam is built and calculated. The calculation results are compared with conventional twodimensional model. Some conclusions are drawn as follows: 1) Twodimensional calculation has some disadvantages, such as too large bending moment and overconservative reinforcement, etc. 2) Compared with twodimensional calculation, threedimensional modeling calculation results are more rational. The study results can provide references for similar projects in the future.

Key words: Metro station, shield hoisting shaft, temporary ring beam, SAP2000, finite elements, threedimensional integral calculation, twodimensional calculation