隧道建设(中英文) ›› 2021, Vol. 41 ›› Issue (S2): 172-179.DOI: 10.3973/j.issn.2096-4498.2021.S2.022
• 研究与探索 • 上一篇 下一篇
尹忠辉
出版日期:
发布日期:
作者简介:
YIN Zhonghui
Online:
Published:
摘要: 为解决水泥搅拌桩成桩质量缺陷,提升实体工程品质,通过分析水泥搅拌桩成桩质量的影响因子,研究造成水泥搅拌桩成桩质量缺陷的原因,针对每种原因提出相应的解决措施,分析钻杆下沉或提升速度、转速、翼片宽度、翼片角度、翼片枚数、翼片组合方式等参数对成桩效果的影响,并通过建立数学模型进行剖析。得出: 当翼片枚数、翼片有效搅拌宽度一定时,钻杆转速越大,所允许钻杆下沉和提升速度越大;搅拌桩成桩质量不受翼片间距的影响。
关键词: 水泥搅拌桩, 施工参数, 钻杆下沉和提升速度, 转速, 翼片间距, 数学模型
Abstract: To improve the quality of mixing piles and further improve the quality of engineering, the factors affecting the quality of cement mixing piles are analyzed, the causes for quality defects of cement mixing piles are studied, and corresponding solutions are proposed. The influence of sinking and lifting speed, drilling speed, blade width, blade angle, blade number, and blade combination mode of drill rod on the pile formation effect is analyzed, and a mathematical model is established. It is concluded that when the number and the effective mixing width of blade are constant, the greater the drilling speed of the drill rod, the greater the allowable sinking and lifting speed; while the blade spacing does not affect the quality of the mixing pile.
Key words: cement mixing pile, construction parameters, drill rod sinking and lifting speed, rotation speed, distance between blades, mathematical model
中图分类号:
U 45
尹忠辉. 水泥搅拌桩施工参数间相关关系研究[J]. 隧道建设, 2021, 41(S2): 172-179.
YIN Zhonghui. Correlation about Construction Parameters of Cement Mixing Pile[J]. Tunnel Construction, 2021, 41(S2): 172-179.
0 / / 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: http://www.suidaojs.com/CN/10.3973/j.issn.2096-4498.2021.S2.022
http://www.suidaojs.com/CN/Y2021/V41/IS2/172
S型空间曲线圆形顶管管道应力分析——以宁波市电力隧道顶管工程为例
超大直径盾构近接侧穿临堤桥梁桩基变形控制研究——以济南济泺路穿黄隧道工程为例