隧道建设(中英文) ›› 2022, Vol. 42 ›› Issue (S2): 516-524.DOI: 10.3973/j.issn.2096-4498.2022.S2.065

• 施工机械 • 上一篇    下一篇

基于FPITPI指标的TBM刀盘转速预测

兴海1, 王双敬2, 3, *, 尹韬2, 4   

  1. 1. 中国水利水电第六工程局有限公司, 辽宁 沈阳 110179 2. 中国水利水电科学研究院, 北京 100048;3. 中铁工程装备集团有限公司, 河南 郑州 450016; 4. 云南农业大学, 云南 昆明 650201)

  • 出版日期:2022-12-30 发布日期:2023-03-27
  • 作者简介:兴海(1987—),男,辽宁抚顺人,2011年毕业于辽宁石油化工大学,机械设计制造及其自动化专业,本科,工程师,现从事TBM、盾构施工生产及技术管理工作。Email: 527303657@qq.com。*通信作者: 王双敬, Email: shuangjingde@163.com。

Prediction Model for Tunnel Boring Machine Cutterhead Rotation Speed Based on Field Penetration Index and Torque Penetration Index

XING Hai1, WANG Shuangjing2, 3, *, YIN Tao2, 4   

  1. (1.Sinohydro Bureau 6 Co.,Ltd.,Shenyang 110179,Liaoning,China;2.China Institute of Water Resources and HydropowerResearch,Beijing 100048, China;3.China Railway Engineering Equipment Group Ltd.,Co.,Zhengzhou 450016,Henan,China;4.Yunnan Agricultural University,Kunming 650201,Yunnan,China)

  • Online:2022-12-30 Published:2023-03-27

摘要:

为合理选择TBM施工过程中不同围岩状况下的刀盘转速,在破岩关键参数(贯入度、推力、转矩)的基础上引入现场贯入指标(FPI)和转矩贯入指标(TPI),分析其与刀盘转速的关系,并通过工程数据统计结合定量分析方法,建立基于FPITPI指标的刀盘转速预测模型。在引绰济辽TBM工程应用结果表明,该预测模型在典型破碎围岩过程的刀盘转速预测最大误差为0.36 r/min,对连续循环段的刀盘转速平均绝对误差为0.55 r/min。基于本方法建立的预测模型,可有效提高待掘进段不同围岩条件下刀盘转速选择的合理性。

关键词: TBM, 现场贯入指标FPI, 转矩贯入指标TPI, 刀盘转速

Abstract:

 To reasonably arrange the rotation speed of tunnel boring machine(TBM) cutterhead during construction in different surrounding rock conditions, a prediction model for rotation speed of cutterhead is established based on essential rock breaking parameters such as penetration degree, thrust, and torque while introducing field penetration index (FPI) and torque penetration index (TPI). Then, the relationships between these two indices and cutterhead rotation speed are analyzed. Finally, the statistical features and quantitative analysis of engineering data are employed. The model was applied in the Chaohe river waterdiversion TBM project, and the results show that the maximum error of cutterhead rotation speed in the typical fault zone cyclic sections is 0.36 r/min, and the mean absolute error of cutterhead rotation speed in the continuous cyclic sections is 0.55 r/min. The prediction model established can provide reference for reasonable arrangement of cutterhead rotation speed under different surrounding rock conditions.

Key words: tunnel boring machine, field penetration index, torque penetration index, cutterhead rotation speed