Tunnel Construction ›› 2012, Vol. 32 ›› Issue (增刊1): 71-74.DOI: 10.3973/j.issn.1672-741X.2012.z1.015
Previous Articles Next Articles
CHENG Linfei, XU Jianfei, TAN Jiao
Received:
Revised:
Online:
Published:
Abstract:
There are many disadvantages, including difficulties, large cost and low construction efficiency, in shield tunneling in reclamation areas. Difficulties met in the shield tunneling in QianhaiLiyumen section of Shenzhen Metro line 1 and countermeasures are analyzed and summarized.
Key words: reclamation area, shield machine, tunneling control
CHENG Linfei, XU Jianfei, TAN Jiao. Difficultycontrolling Technologies of Shield Tunneling in Reclamation Areas[J]. Tunnel Construction, 2012, 32(增刊1): 71-74.