Difficultycontrolling Technologies of Shield Tunneling in Reclamation Areas

CHENG Linfei, XU Jianfei, TAN Jiao   

  1. (Track Traffic Engineering Co., Ltd. of China Railway First Group, Xi’an,710054, China)
  • Received:2012-06-19 Revised:2012-08-20 Online:2012-11-20 Published:2013-02-19

Abstract:

There are many disadvantages, including difficulties, large cost and low construction efficiency, in shield tunneling in reclamation areas. Difficulties met in the shield tunneling in QianhaiLiyumen section of Shenzhen Metro line 1 and countermeasures are analyzed and summarized.

Key words: reclamation area, shield machine, tunneling control