Tunnel Construction ›› 2014, Vol. 34 ›› Issue (5): 494-498.DOI: 10.3973/j.issn.1672-741X.2014.05.016

Previous Articles     Next Articles

Anchoring Cable Removing Technology: Case Study on HuiMin Shieldbored Tunnel on Line 1 of Zhengzhou Metro

LI Guangliang   

  1. (Beijing Metro Engineering Construction Co., Ltd., China Railway 16th Bureau Group, Beijing 101100, China)
  • Received:2014-01-20 Revised:2014-03-05 Online:2014-05-20 Published:2014-05-14

Abstract:

There are lots of existing deep anchoring cables in the scope of HuiMin shieldbored tunnel on Line 1 of Zhengzhou Metro. These anchoring cables should be removed before shield arrives, otherwise they may have severe impact on the shield boring. In the paper, comparison and contrast is made among three anchoring cable removing technologies, i.e., removing the anchoring cables from opencut foundation pit, removing the anchoring cables from mined tunnel and removing the anchoring cables from cut holes, in terms of construction period and cost. In the end, the technology of removing the anchoring cables from cut holes is adopted. The details of the technology of removing the anchoring cables from cut holes are presented. 

Key words: rail transit, underground space, anchoring cable removing, cuthole