Abstract:
Yuntunbao tunnel on ChengduLanzhou railway is more than 20 km long. The construction of the approach works to the entrance and exit of Yuntunbao tunnel has already been started before the construction of Yuntunbao tunnel. In the paper, two options, i.e., the option of single doubletrack tunnel tube and the option of double singletrack tunnel tubes, are proposed for the tunnel, and comparison and contrast is made on these two options in terms of disaster prevention and rescue, project investment, construction risk control, construction organization, adaptability of the support structure to the serious deformation of the soft rocks, seismic resistance of the tunnel structure, mucking, environment protection and operation ventilation. It is concluded that the option of single doubletrack tunnel tube can be adopted for Yuntunbao tunnel.
Key words: ChengduLanzhou railway, superlong Yuntunbao tunnel, single doubletrack tunnel tube, twin singletrack tunnel tubes, option analysis
CLC Number:
U 452.2
ZHU Yong, WU Hua. Single Doubletrack Tunnel Tube or Twin Singletrack Tunnel Tubes: Case Study on Superlong Yuntunbao Tunnel on ChengduLanzhou Railway[J]. Tunnel Construction, 2014, 34(7): 661-667.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2014.07.011
http://www.suidaojs.com/EN/Y2014/V34/I7/661