ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2014, Vol. 34 ›› Issue (8): 765-770.DOI: 10.3973/j.issn.1672-741X.2014.08.010
Previous Articles Next Articles
YANG Shujiang
Received:
Revised:
Online:
Published:
Abstract:
The shield tunneling of Line 1 of Xiamen Metro is studied in terms of geology survey, shield selection, shield boring under complex geological conditions and assistant construction methods, so as to ensure the successful construction of the project. Conclusions drawn are as follows: 1) Detailed engineering geological and hydrogeological survey is the basis for the construction of the project; 2) Shield suitable for the geological conditions of the project is fundamental for the construction of the project; 3) Proper shield boring parameters and proper assistant construction methods are guarantee for the construction of the project.
Key words: Xiamen Metro, complex geology, shield selection, construction, assistant construction method
CLC Number:
U 45
YANG Shujiang. Shield Tunneling Technologies for Xiamen Metro under Complex Geological Conditions[J]. Tunnel Construction, 2014, 34(8): 765-770.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2014.08.010
http://www.suidaojs.com/EN/Y2014/V34/I8/765