Tunnel Construction ›› 2020, Vol. 40 ›› Issue (4): 603-610.DOI: 10.3973/j.issn.2096-4498.2020.04.019
Previous Articles Next Articles
陈 越, 陈伟乐, 宋神友, 刘 健, 金文良
Received:
Online:
Published:
Abstract:
Shenzhen-Zhongshan Crossing-river Link ( Shen-Zhong Link) is the key project in G2518 of National Expressway Network, across the Pearl River Estuary. Shen-Zhong Link is a mega project integrating bridges, artificial islands, tunnel, and underwater interchanges, which is built according to the standard for bi-direction eight-lane expressways. The total length of the project is 24 km, of which the tunnel is 6 845 m long, constructed by immersed tube method. Through experimental researches, analysis and demonstration, the technological requirements and construction process for the steel-concrete-steel composite structure of the rectangular immersed tube, the pre-laid gravel cushion and the underwater deep cement mixing (DCM) pile foundation treatment. In addition, a series of special construction equipment, such as the self-propelled huge barge integrated with the floating, towing, immersion and installation functions is developed.
Key words: Shenzhen-Zhongshan Link, immersed tunnel, steel-concrete-steel composite structure, foundation treatment, special construction equipment
CLC Number:
U 45
陈 越, 陈伟乐, 宋神友, 刘 健, 金文良. 深中通道沉管隧道主要建造技术[J]. Tunnel Construction, 2020, 40(4): 603-610.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.2096-4498.2020.04.019
http://www.suidaojs.com/EN/Y2020/V40/I4/603
Review on Development of Joint Type and Deformation Mechanism of Immersed Tunnel
Innovation and Practice of Key Technologies for Immersed Tunnel Terminal Joint Based on Friction Antithrust
Design and Application of Secondary Cofferdam Structure at Onshore Final Joint of Immersed Tunnel: a Case Study of Yuliangzhou Section
Research and Application of Assembled Steel Bulkhead for Hanjiang Immersed Tunnel in Xiangyang, China
Damage and Deformation of Chebei Road Immersed Tunnel Based on Multiple Lateral Differential Foundation Stiffness
Foundation Settlement Control Analysis of Immersed Tunnel at Connection between Offshore Artificial Island and Tunnel
Development and Prospect of Immersed Tunnel and Artificial Island Technology
Experimental Study on Prefabricated Partial Block of Immersed Tunnel of Xiangyang East-West Axis Project