Tunnel Construction ›› 2015, Vol. 35 ›› Issue (4): 373-376.DOI: 10.3973/j.issn.1672-741X.2015.04.016

Previous Articles     Next Articles

Technologies for Assembly of Separation Wall of a Metro Tunnel on South Section of No. 11 Line of Shanghai Rail Transit Works

ZHOU Junli   

  1. (Shanghai Urban Construction Municipal Engineering (Group) Co., Ltd., Shanghai 200065, China)
  • Received:2012-10-29 Revised:2015-01-15 Online:2015-04-20 Published:2015-04-22

Abstract:

The south section of No. 11 Line of Shanghai rail transit works is a singletube doubletrack tunnel bored by 11.58 m slurry shield. Prefabricated concrete separation wall is assembled within the Metro tunnel. To this end, a separation wall assembling machine is developed on basis of the construction schedule and the working environment, so as to improve the assembly efficiency and the assembly quality. In the paper, the key technologies for the assembly of the separation wall, including the prefabricated component hoisting and assembling technology, the temporary supporting technology and the dowel steel installation technology, are presented.

Key words: No. 11 Line of Shanghai Rail Transit Work, singletube tunnel containing double tracks, Metro tunnel, separation wall, prefabricated component, hoisting