| [1] |
SUN Yi, YU Hongwei, YE Ming, WU Gensheng, REN Changchun, DU Zhanjun, ZHANG Yunpei, LI Xu, LI Jian.
Intelligent Recognition Methods for Muck Flow Status in Inclined Shaft TBM
[J]. Tunnel Construction, 2025, 45(S2): 214-221.
|
| [2] |
LIU Xiaomin, SONG Ziwen, WANG Shiyou, CHEN Hongke, JIN Chunshang, SONG Liwei.
Selection and Adaptability
of Shields in Calcareous Cemented Strata in Israel: A Case Study of Tel Aviv Green Line Light Rail Project
[J]. Tunnel Construction, 2024, 44(S2): 452-461.
|
| [3] |
JIA Lianhui, SUN Heng, ZHANG Xingbin, YU Qingzeng, LI Lei, NING Xiangke.
Crucial Construction
Technology of Tunnel Boring Machines for Constructing Large-Slope Inclined Shaft in Pumped Storage
Power Station
[J]. Tunnel Construction, 2024, 44(8): 1660-1668.
|
| [4] |
TAN Zhongsheng, DENG Mingjiang.
Resea-Long
Tunnels
[J]. Tunnel Construction, 2024, 44(3): 442-463.
|
| [5] |
YANG Lixin.
Issues Related to Application of Jet Fans in
Partitioned Ventilation of
Tunnel Inclined Shafts
[J]. Tunnel Construction, 2023, 43(S1): 54-60.
|
| [6] |
TIAN Jingwei, WAN Xiaoyan, SHI Xianming.
Effect of Air Extraction From Inclined Shafts in
Tunnels on Overturning Stability of HighSpeed
Trains
[J]. Tunnel Construction, 2023, 43(S1): 233-239.
|
| [7] |
XU Jianfeng, XU Zhonglin, GUO Chun, YUAN Kun, DONG Haijiang, YANG Xiaobing, YANG Yongpeng, TIAN Ye, CHEN Yuqi.
Characteristics of Carbon Emissions from Excavation
and Supporting During Construction of
Inclined Shafts of Highway Tunnels
[J]. Tunnel Construction, 2023, 43(7): 1146-1152.
|
| [8] |
TANG Jianguo, PENG Zhengyang, ZHANG Xiangfu, REN Xin, YUE Jinwen, ZHOU Fangjian.
Effect of Tunneling Parameters on Mucking Performance
of Tunnel Boring Machine Cutterhead in PumpedStorage Power Station Inclined Shaft
[J]. Tunnel Construction, 2022, 42(S2): 29-35.
|
| [9] |
PEI Zhenzhen, WANG Yanan.
Economic Comparison of Dimension of Inclined Shaft
CrossSection and Ventilation Pipe of DoubleTube Tunnel
[J]. Tunnel Construction, 2022, 42(S2): 213-219.
|
| [10] |
JIANG Qiao.
Key Technology of Hysteresis Control for SuperLargeDiameter Slurry Shield
[J]. Tunnel Construction, 2021, 41(S2): 620-625.
|
| [11] |
YANG Yang, TANG Ke, GONG Bin, YAN Jian, WANG Bo.
Drainage Technology of Main Tunnel Construction
Assisted by Inclined Shaft in High-Altitude Water-Rich Tunnels: a Case Study on
Extra-Long -Milashan Tunnel of
Nyingchi-Lhasa Highway in Tibet, China
[J]. Tunnel Construction, 2021, 41(12): 2171-2177.
|
| [12] |
WANG Famin, SUN Zhenchuan, ZHANG Lianghui, LI Fengyuan, ZHANG Bing, WANG Guo′an.
Design of Super-large Diameter Slurry Shield Used in Shantou Bay Tunnel and Construction Countermeasures for Unfavorable Geology
[J]. Tunnel Construction, 2020, 40(5): 735-746.
|
| [13] |
LI Jiangao, LIU Yafei.
Study on Comprehensive Cooling Technology for High
Ground Temperature in Long and Large Inclined Shaft of
DaliRuili Railway
[J]. Tunnel Construction, 2020, 40(10): 1498-1505.
|
| [14] |
LI Zhijun, FANG Youliang, XIAO Gang, LAI Wenhui, QU Yong, FU Jinyang, XU Zan.
Ground Deformation Characteristics of Water-rich Gravel Stratum during EPB Shield Stop
[J]. Tunnel Construction, 2020, 40(1): 106-113.
|
| [15] |
LUO Gang, PAN Shaokang, YANG Panshi, ZHOU Jia, LIU Chang.
Design and Optimization of Rail Transportation System of Double Steep Inclined Shaft in Tiantaishan Tunnel
[J]. Tunnel Construction, 2019, 39(12): 2050-.
|