Tunnel Construction ›› 2015, Vol. 35 ›› Issue (4): 373-376.DOI: 10.3973/j.issn.1672-741X.2015.04.016
Previous Articles Next Articles
ZHOU Junli
Received:
Revised:
Online:
Published:
Abstract:
The south section of No. 11 Line of Shanghai rail transit works is a singletube doubletrack tunnel bored by 11.58 m slurry shield. Prefabricated concrete separation wall is assembled within the Metro tunnel. To this end, a separation wall assembling machine is developed on basis of the construction schedule and the working environment, so as to improve the assembly efficiency and the assembly quality. In the paper, the key technologies for the assembly of the separation wall, including the prefabricated component hoisting and assembling technology, the temporary supporting technology and the dowel steel installation technology, are presented.
Key words: No. 11 Line of Shanghai Rail Transit Work, singletube tunnel containing double tracks, Metro tunnel, separation wall, prefabricated component, hoisting
CLC Number:
U 459.3
ZHOU Junli. Technologies for Assembly of Separation Wall of a Metro Tunnel on South Section of No. 11 Line of Shanghai Rail Transit Works[J]. Tunnel Construction, 2015, 35(4): 373-376.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2015.04.016
http://www.suidaojs.com/EN/Y2015/V35/I4/373
Experimental Effect Prediction of Ground Conditioning of Water rich Sandy Stratum Based on BP Neural Network