Abstract:
The he opencut construction method is used in the construction of passengerdedicated gallery of Changsha Railway Station crossing underneath BeijingGuangzhou Freight Line. The key technologies of the mentioned method are improved, and the project has been successfully completed.
Key words: railway station, underground gallery, existing freight line, opencut and castinsitu method, Dshaped temporary beam, foundation
CLC Number:
U 455
FU Zheng. Key Construction Technologies for Passengerdedicated Gallery of Changsha Railway Station Crossing Underneath BeijingGuangzhou Freight Line[J]. Tunnel Construction, 2015, 35(S2): 115-120.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2015.S2.020
http://www.suidaojs.com/EN/Y2015/V35/IS2/115