Key Construction Technologies for Passengerdedicated Gallery of Changsha Railway Station Crossing Underneath BeijingGuangzhou Freight Line

FU Zheng   

  1. (China Railway Tunnel Stock Co., Ltd., Zhengzhou 450000, Henan, China)
  • Received:2015-05-31 Revised:2015-09-29 Online:2015-12-15 Published:2015-12-24

Abstract:

The he opencut construction method is used in the construction of passengerdedicated gallery of Changsha Railway Station crossing underneath BeijingGuangzhou Freight Line. The key technologies of the mentioned method are improved, and the project has been successfully completed.

Key words: railway station, underground gallery, existing freight line, opencut and castinsitu method, Dshaped temporary beam, foundation