ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2015, Vol. 35 ›› Issue (S2): 138-142.DOI: 10.3973/j.issn.1672-741X.2015.S2.024
Previous Articles Next Articles
DENG Yang
Received:
Revised:
Online:
Published:
Abstract:
In this paper, the shield tunneling crosses existing tunnel constructed by mining method without load is presented in detail. The conclusions drawn are as follows: 1)The primary construction quality and late over/short break of primary support and guide platform effect tunnel axial line directly. 2) The quantity and location of backfilling material effect the forcing load of shield advancing directly. The analysis and calculation results show that the actual monitoring value of backfilling material reaches 110%, the synchronous grouting volume reaches 80%, and the stress control lead a predominant effect during supplemental grouting.
Key words: Guangzhou Metro, shield advancing without load, mining method, quality defects, grouting filling
CLC Number:
U 455.2
DENG Yang. Organization Design of Shield Crossing Existing Mined Tunnel without Load:Case Study on Phase 2 Project on No. 6 Line of Guangzhou Metro[J]. Tunnel Construction, 2015, 35(S2): 138-142.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2015.S2.024
http://www.suidaojs.com/EN/Y2015/V35/IS2/138