Tunnel Construction ›› 2015, Vol. 35 ›› Issue (S2): 157-161.DOI: 10.3973/j.issn.1672-741X.2015.S2.028
Previous Articles Next Articles
ZHANG Meng, SUN Cheng
Received:
Revised:
Online:
Published:
Abstract:
In this paper, the causes for shield launching difficulty are analyzed. The causes for cutter head mud cake, ground settlement and grout burst lies on complex strata, bad ground conditioning effect and shallow cover. The countermeasures, including, adding additives, cutter head cleaning, and using cooling tower, are adopted. The paper can provide reference for similar projects in the future.
Key words: largediameter EPB shield, complex strata, excavation difficulty, mud cake on cutter head, ground conditioning, grout burst
CLC Number:
U 455.3+9
ZHANG Meng, SUN Cheng. Technologies for Largediameter Earth Pressure Balance Shield Boring in Complex Strata[J]. Tunnel Construction, 2015, 35(S2): 157-161.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2015.S2.028
http://www.suidaojs.com/EN/Y2015/V35/IS2/157
Experimental Effect Prediction of Ground Conditioning of Water rich Sandy Stratum Based on BP Neural Network