ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2015, Vol. 35 ›› Issue (S2): 157-161.DOI: 10.3973/j.issn.1672-741X.2015.S2.028

Previous Articles     Next Articles

Technologies for Largediameter Earth Pressure Balance Shield Boring in Complex Strata

ZHANG Meng, SUN Cheng   

  1. (Tunnelingdedicated Equipment Center, China Railway Tunnel Group Co., Ltd., Luoyang 471009, Henan, China)
  • Received:2015-05-22 Revised:2015-06-19 Online:2015-12-15 Published:2015-12-24

Abstract:

In this paper, the causes for shield launching difficulty are analyzed. The causes for cutter head mud cake, ground settlement and grout burst lies on complex strata, bad ground conditioning effect and shallow cover. The countermeasures, including, adding additives, cutter head cleaning, and using cooling tower, are adopted. The paper can provide reference for similar projects in the future.

Key words: largediameter EPB shield, complex strata, excavation difficulty, mud cake on cutter head, ground conditioning, grout burst

CLC Number: