Tunnel Construction ›› 2017, Vol. 37 ›› Issue (10): 1317-1321.DOI: 10.3973/j.issn.1672-741X.2017.10.016
Previous Articles Next Articles
CHEN Yuyuan
Received:
Revised:
Online:
Published:
Abstract:
The Futian Station and adjacent interval tunnels on GuangzhouShenzhenHongkong Passengerdedicated Line are singletube doubleline tunnels characterized by high speed, large crosssection, small blocking ratio, low piston effect and large heat dissipation. In order to ensure the personnel comfortable requirements inside the tunnel, the key technologies of controlling the temperature and fresh air inside the tunnel should be solved. The setting of piston shafts of intervals and station, shaft area and volume of exhaust air are studied. Some conclusions are drawn as follows: 1) Five piston shafts should be set inside the tunnel in total, namely shaft No. 1 and No. 2 on Yitian Road, one on both ends of Futian Station and one in Huanggang Park. 2) The shaft area on both ends of Futian station is 60 m2 respectively; and the other three are 40 m2 respectively. 3) The air exhausting volume of Futian Station is 540 m3/s. 4) The optimized highest temperature inside the tunnel is 39.3 ℃; and the perperson ventilation rates is 76 m3/h, which coincides with the design standards.
Key words: underground station of passengerdedicated line, interval tunnel, ventilation system, optimization
CLC Number:
U 45
CHEN Yuyuan. Study of Ventilation System of Futian Station and Adjacent Interval Tunnels〖JP〗on GuangzhouShenzhenHongkong Passengerdedicated Line[J]. Tunnel Construction, 2017, 37(10): 1317-1321.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2017.10.016
http://www.suidaojs.com/EN/Y2017/V37/I10/1317