| [1] |
YAO Hongzhi, WANG Han, BAI Dongfeng, SHI Baotong, ZHENG Wankun, ZHANG Caifei, HAN Xingbo.
Comparative Analysis of Construction Excavation Schemes and Support Parameters for Ultra-Large-Span Underground Storage Tank Space
[J]. Tunnel Construction, 2025, 45(S2): 289-301.
|
| [2] |
LIU Xian, GAN Haijie, HONG Jianyu, ZHANG Fan, WANG Jinlong.
Mechanical Performance of Shield Tunnel Lining Structures Reinforced With Ultra-High-Performance Concrete With Variable Sections
[J]. Tunnel Construction, 2025, 45(8): 1441-1450.
|
| [3] |
WANG Xuejian, ZHANG Yuyu, JIANG Sili, WANG Jiayuan.
Risk Management and Platform Implementation of Shield Tunneling in Metro Engineering Based on Digital Twin
[J]. Tunnel Construction, 2025, 45(11): 2100-2116.
|
| [4] |
XIAO Qinghua, YUAN Hao, XIA Jinxuan, OU Xiaoqiang, ZANG Xiwei, ZHONG Dechao, LIU Zhiqiang.
Tunnel Blasting Parameters
Optimization Design Method Based on Three-Dimensional Laser Sensing
[J]. Tunnel Construction, 2024, 44(S1): 8-15.
|
| [5] |
YANG Bin, LIU Tianci, LIU Zhichun, LI Ning, DUO Shengjun.
CrossSection Shape Optimization Design of
Railway Tunnel in
Squeezing Rock Based on Deformation Classification
[J]. Tunnel Construction, 2023, 43(S1): 344-355.
|
| [6] |
TAO Qi.
Stability Control of High GeoStress
Soft Rock Tunnels Considering Rock Expansion Effect: A
Case study of Milin Tunnel
[J]. Tunnel Construction, 2023, 43(8): 1327-1337.
|
| [7] |
LI Zhijun, LIU Guangzhi, YU Jingbo, CHEN Qiao.
Key Techniques of Excavation and Blasting in ShallowBuried
Soft and Hard Strata
of Tunnel Boring Machine Preparatory Tunnel of Plateau Railway
[J]. Tunnel Construction, 2022, 42(6): 1044-1052.
|
| [8] |
SONG Pengwei, YANG Xin′an, LI Huai, SUN Weixing.
Optimization of Charge Structure of Peripheral
Blasting Holes Based on
Shaped Energy Water Pressure Smooth Blasting Technology
[J]. Tunnel Construction, 2022, 42(1): 103-112.
|
| [9] |
FANG Junbo, LIU Hongzhen, MA Liuchuang.
Tunnel Overbreak Control Technology by Rock drilling
Jumbo with Long and Short Blasting Holes
[J]. Tunnel Construction, 2020, 40(11): 1642-1648.
|
| [10] |
LIN Chungang, LI Jing, WANG Baiquan, SHANG Wei, XIE Tao.
Design and Application Technology of New Type of Lining Trolley with FormworkFrame Integration
[J]. Tunnel Construction, 2019, 39(S1): 433-437.
|
| [11] |
YIN Dewen, WANG Xueying, YANG Xiaojing.
Optimization Design of Headrace Tunnel of CCS Hydropower Station in Ecuador
[J]. Tunnel Construction, 2019, 39(2): 246-253.
|
| [12] |
YIN Wengang, WANG Hailiang, HU Hongxing, ZHANG Fuqiang, CHEN Jihui.
Study of Tunnel Controlled Blasting Technology and Blastinduced Damage Zone of Surrounding Rocks
[J]. Tunnel Construction, 2018, 38(5): 851-856.
|
| [13] |
HE Chuang, YIN Dongmei, WANG Hailiang, YAN Honghao.
Analysis of Influence of Free Surface and Minimum Resistance Line on Blasting Vibration
[J]. Tunnel Construction, 2018, 38(1): 50-56.
|
| [14] |
ZHAO Wei, SHANG Jun, CHEN Hong.
Construction Technology for Inverted Arch Secondary Lining in Large Section of Singletrack Railway Tunnel
[J]. Tunnel Construction, 2017, 37(S2): 234-239.
|
| [15] |
HE Chuang, WANG Hailiang.
Study of Micro Vibration Blasting Parameters of Multilevel Wedgecutting of Mined Metro Station
[J]. Tunnel Construction, 2016, 36(8): 941-946.
|