ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2018, Vol. 38 ›› Issue (S2): 285-291.DOI: 10.3973/j.issn.2096-4498.2018.S2.038
Previous Articles Next Articles
WEN Zhe1, YANG Guosheng2
Received:
Revised:
Online:
Published:
Abstract:
In order to precisely control the operations such as floating transportation,sinking, docking and buttjointing in the underwater construction of inland river immersed tunnel,the marine navigation system is introduced and successfully applied to the immersed pipe construction of Honggu Tunnel. Through analyzing the working principle and measuring method of the system, it is concluded that the system can meet the construction requirements of floating, sinkingand jointing of pipe joints in this project in terms of measuring and positioning accuracy.Combined with the realtime monitoring system, a precise control system for the above processesis formed.The controlled operation flow of the system is demonstrated through engineering example, which can provide valuable experience and implementation method for similar immersed tunnel projects.
Key words: marine navigation system, immersed tunnel, pipe section floating, sinking and jointing, visualization, remote monitoring
CLC Number:
U 459.5
WEN Zhe, YANG Guosheng. Application of Maritime Navigation System in Floating, Sinking and Jointing of Pipe Joint[J]. Tunnel Construction, 2018, 38(S2): 285-291.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.2096-4498.2018.S2.038
http://www.suidaojs.com/EN/Y2018/V38/IS2/285