[1] |
ZENG Bocun, CAO Linxiang, ZHOU Xingtao, SUN Xiaowei, WANG Cong, HU Jiayi.
Research and Application of Assembled Steel Bulkhead
for Hanjiang Immersed Tunnel in Xiangyang, China
[J]. Tunnel Construction, 2022, 42(9): 1605-1614.
|
[2] |
GUO Jianmin, SHAN Lianjun.
Structure Type and Prefabrication Scheme of Immersed
Tunnels in Urban Core Areas: a Case Study of Pazhou
West Tunnel Project in Guangzhou, China
[J]. Tunnel Construction, 2022, 42(11): 1906-1912.
|
[3] |
WANG Zhan, ZHANG Baohu, ZHANG Yanmeng, GUO Qiang, SUN Hong.
Damage and Deformation of Chebei Road Immersed Tunnel
Based on Multiple
Lateral Differential Foundation Stiffness
[J]. Tunnel Construction, 2021, 41(S2): 209-214.
|
[4] |
XU Yu, XU Guoping, FU Baiyong, HE Xiao.
Foundation Settlement Control Analysis of Immersed
Tunnel at
Connection between Offshore Artificial Island and Tunnel
[J]. Tunnel Construction, 2021, 41(S1): 338-.
|
[5] |
CHENG Yipin, CHEN Weile, SONG Shenyou, SUN Haifeng, SUO Xuhong.
Calibration Accuracy Comparison between Floating State
of Measuring
Tower and Coordinate Bottom for ImmersedTube
Installation
in
ShenzhenZhongshan Link
[J]. Tunnel Construction, 2021, 41(8): 1399-.
|
[6] |
LIN Wei, LIANG Jiezhong, LIU Lingfeng, ZOU Wei, LIN Ming.
Development and Prospect of Immersed Tunnel and Artificial
Island Technology
[J]. Tunnel Construction, 2021, 41(12): 2029-2036.
|
[7] |
WANG Tao, WANG Min, PENG Zhutao, XIAO Li.
Service Status and Disease Analysis of Asphalt
Pavement of Immersed Tunnel
[J]. Tunnel Construction, 2020, 40(S1): 429-435.
|
[8] |
DENG Xiaohua, SONG Shenyou, CAO Zhengmao, ZHANG Qi.
Overall Scheme of Smoke Exhaustion System of Submarine
Tunnel of Shenzhen Zhongshan Link
[J]. Tunnel Construction, 2020, 40(8): 1176-1184.
|
[9] |
陈伟乐, 宋神友, 金文良, 夏丰勇.
Plan and Practice of Intelligent Construction System of SteelConcreteSteel Composite Immersed Tunnel of ShenzhenZhongshan Link
[J]. Tunnel Construction, 2020, 40(4): 465-474.
|
[10] |
陈 越, 陈伟乐, 宋神友, 刘 健, 金文良.
深中通道沉管隧道主要建造技术
[J]. Tunnel Construction, 2020, 40(4): 603-610.
|
[11] |
ZHU Jinbo, WANG Cong.
Design and Application Technology of Fullsection
Large Hydraulic Formwork Trolley for Immersed Tunnel
Segment Prefabrication
[J]. Tunnel Construction, 2020, 40(12): 1817-1823.
|
[12] |
WANG Cong, PENG Hao.
Experimental Study on Prefabricated Partial Block of
Immersed Tunnel of Xiangyang
East-West Axis Project
[J]. Tunnel Construction, 2020, 40(10): 1433-1440.
|
[13] |
LI Hongzhe, JIANG Guodong, ZHANG Guozhu, LIU Yiping.
Consideration on Common Diseases of Immersed Tunnel and Its Inspection and Maintenance
[J]. Tunnel Construction, 2019, 39(S1): 465-470.
|
[14] |
WANG Min, LIU Xiaodong, HAO Zengheng, LYU Yonggang.
Structure Design and Application of Asphalt Pavement to Hong KongZhuhaiMacao Bridge Immersed Tunnel
[J]. Tunnel Construction, 2019, 39(5): 802-809.
|
[15] |
LIN Yonggui, YANG Chunshan.
Support Scheme Evaluation and Influencing Factors on Cellular Diaphragm Wall for Drydock Foundation of Immersed Tunnel
[J]. Tunnel Construction, 2019, 39(4): 571-575.
|