Tunnel Construction ›› 2022, Vol. 42 ›› Issue (S1): 155-165.DOI: 10.3973/j.issn.2096-4498.2022.S1.018
Previous Articles Next Articles
HUANG Jiefang1, HUANG Mingli2, *, TAN Zhongsheng2
Online:
Published:
Abstract: Soft rock large deformation occurred in East Tianshan extralong highway tunnel crossing F2 fault fracture zone. Accordingly, the theoretical analysis, numerical simulation, onsite monitoring, and statistical analysis are employed to investigate the control standards of primary support deformation of tunnel constructed by twobench reserved core soil method and threebench method. Then the phased early warning method of primary support deformation is proposed. The results reveal the following: (1) The reserved deformation of East Tianshan tunnel crossing F2 fault fracture zone is recommended to be 60~80 cm, which can meet the construction requirements. (2) The primary support deformations induced by top heading and lower bench excavation using twobench reserved core soil method are recommended to be 60% and 40% in total deformation, respectively, whereas those induced by top heading, middle bench, and lower bench excavation using threebench method are recommended to be 20%, 65%, and 15% in total deformation, respectively. (3) Grades Ⅰ, Ⅱ, and Ⅲ early warning should be started respectively when the primary support deformation not exceed reserved deformation, exceeds the reserved deformation but not exceed 5% of the secondary lining design thickness, and not exceed 10% of the secondary lining design thickness. Normal construction can be operated in case of grade Ⅰ early warning, treatment measures such as controlling excavation advance and bench length, setting up retaining arch in time, and closing primary support as soon as possible shall be undertaken in case of grade Ⅱ early warning, and short bench or micro bench method shall be further used in case of grade Ⅲ early warning.
Key words: highway tunnel, fault fracture zone, soft rock large deformation, reserved deformation, primary support, control standards, early warning of deformation
HUANG Jiefang, HUANG Mingli, TAN Zhongsheng. Phased Control Standards of Primary Support Deformation of East Tianshan Tunnel Crossing Fault Fracture Zone[J]. Tunnel Construction, 2022, 42(S1): 155-165.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.2096-4498.2022.S1.018
http://www.suidaojs.com/EN/Y2022/V42/IS1/155
Impact of Lining Support Cancellation for #1 Inclined Shaft of Qinling Tiantaishan Tunnel
Comparative Analysis of Air Demand Calculation of Highway Tunnel between China’s Ventilation Design Rules 2014 and Foreign PIARC 2019 Standards
Gas Drainage Technology During Large CrossSection Highway Tunnel Crossing though Tectonic Coal Seam
Type Selection of SuperLargeDiameter Slurry Shield Tunneling through Various Typical Strata: a Case Study of Wuhu Yangtze River Tunnel
Wear Law of Shield Disc Cutter of Shield Tunneling in Hard-Soft Mixed Strata of Water Conveyance Tunnel of Tuancheng Lake No.9 Water Plant in Beijing