| [1] |
REN Guoping, ZHANG Jian, FENG Tugen, YU Xuejuan, ZHANG Wenchao, FANG Yuan.
A Dual-Path Prevention and Control Method for Mud Cakes on Shield Cutterhead in Highly Viscous Formations Based on Dispersant Treatment
[J]. Tunnel Construction, 2026, 46(3): 562-575.
|
| [2] |
XIA Runhe, SHEN Qi, OUYANG Guowei, MA Chen, LI Yiming.
Green Ecological and Environmental Protection
Technologies and Management Practices During Construction Period
of Long Tunnels
[J]. Tunnel Construction, 2025, 45(S1): 249-259.
|
| [3] |
ZHUO Yue, NIU Fusheng, WEI Xinyi, LIN Chungang, HE Xiongfei, LI Jing.
Research Status and Development Trend of Treatment Technologies for Structure Diseases in Operating Railway Tunnels
[J]. Tunnel Construction, 2025, 45(12): 2181-2204.
|
| [4] |
ZHOU Mingliang, CHEN Xuanjie, ZHANG Wengang, SHAO Hua, YE Zhenwei, ZHOU Qun, ZHANG Dongming.
Grouting Treatment Effect Evaluation in Shield Tunnels Using Asymmetric Deformation Solution Method
[J]. Tunnel Construction, 2025, 45(11): 2044-2052.
|
| [5] |
NING Jinjin, LYU Yingxue.
Feasibility Study on Immersed-Tube Tunnels in Ultra-Deep (Over 100 m) Water Areas
[J]. Tunnel Construction, 2024, 44(S2): 377-382.
|
| [6] |
XIAN Guo, ZOU Yongmu, LI Xiaobing, WANG Guan, WANG Yangyang.
Integrated Application and
Some Issues of Modern Tunneling Technology
for Chengdu-Kunming Railway Tunnel
[J]. Tunnel Construction, 2024, 44(8): 1713-1722.
|
| [7] |
LI Jing, WU Hailong, HE Qiantu, LIN Chungang.
Scheme Design of Trolley for Disease Control of
Operational Railway Tunnel Based on Analytic Hierarchy
ProcessTRIZ
[J]. Tunnel Construction, 2024, 44(4): 801-809.
|
| [8] |
QIAO Xiong, YANG Xiaolong, FENG Yong.
Current Status and Prospects of Research on Tunnel
Frost Damage in Highaltitude and Severely Cold
Region
[J]. Tunnel Construction, 2024, 44(2): 233-256.
|
| [9] |
TIAN Xuehao, SONG Dan, JIANG Shuai, FU Kaiyong, GAO Lijun, WANG Baisong.
Research and Application for Mechanization of Lining
Construction of Operating Railway Tunnels
[J]. Tunnel Construction, 2024, 44(2): 368-376.
|
| [10] |
CHEN Songlin, WANG Lichuan, HU Hengqian, WANG Shuying, YANG Zebin, CHONG Panpan, LU Chuang, CHEN Hongwei.
Fault and Fracture Zone Collapse Treatment Technology
for Open Tunnel Boring Machine
Applied in Beijiang Water Diversion Project
[J]. Tunnel Construction, 2023, 43(12): 2122-2132.
|
| [11] |
LIU Chuanli, TONG Jianjun.
Case Analysis and Comprehensive Treatment Evaluation
of LandslideTunnel Oblique System: a Case
Study of Exit Section of Chunping No. 2 Tunnel of
DaguanYongshan Expressway in Yunnan, China
[J]. Tunnel Construction, 2022, 42(S2): 161-167.
|
| [12] |
PAN Yue, HE Xiongfei, ZOU Chong, YANG Chaoshuai.
Feasibility and Performance Requirements of UltraHighPerformance Concrete in Crack Treatment of Tunnel Lining
[J]. Tunnel Construction, 2022, 42(9): 1647-1655.
|
| [13] |
ZHAO Shaozhong, HUANG Xin, XU Zhenhao, LI Minghai.
Development Characteristics and Treatment Techniques
of Karst Caves in Qiyueshan Tunnel
[J]. Tunnel Construction, 2022, 42(7): 1289-1299.
|
| [14] |
LIU Heng, SUN Xiaohui, MU Song, ZHOU Xuebin, LI Heng, CHEN Xiangsheng.
Treatment Process and a Complete Set of Equipment for
Resource Utilization of Waste Soil in Shield Tunneling
[J]. Tunnel Construction, 2022, 42(2): 320-327.
|
| [15] |
ZHU Wei, QIAN Yongjin, WANG Lu, WEI Bin, LU Kaijun, FANG Zhongqiang, MENG Lifu.
Classification, Treatment, and Utilization Techniques
of Shield Tunnel Abandoned Soil and Related Issues
[J]. Tunnel Construction, 2021, 41(S2): 1-13.
|