[1] |
ZHAO Yong, YU Zufa, CAI Jue, LYU Gang, LIU Jianyou, YUE Ling.
Design Concept and Implementation Path for Badaling
Great Wall Station of BeijingZhangjiakou Highspeed Railway
[J]. Tunnel Construction, 2020, 40(7): 929-940.
|
[2] |
LI Xiaojun, TIAN Yinxue, CHEN Shuwang, WANG Anmin.
Application Status and Analysis of Building
Information Model (BIM) Technology
in Tunnel Engineering
[J]. Tunnel Construction, 2020, 40(7): 953-0963.
|
[3] |
FENG Haibao, LIU Junwei, SU Changxi.
Analysis of Channel Dimensions for Immersed Tube
Element Towed by Selfpropelled Catamaran: a Case Study on
Immersed Tunnel of ShenzhenZhongshan
Link
[J]. Tunnel Construction, 2020, 40(6): 840-844.
|
[4] |
LIU Ze, WANG Yong, LI Xiaofeng, WU Zhihao.
Key Technologies for Type Selection and Application of
Doublemode TBM in Complex Geology of Sea Area
[J]. Tunnel Construction, 2020, 40(6): 868-872.
|
[5] |
ZHANG Binrong, GUAN Huisheng, TAN Xiaofeng, LIAO Jiang, YANG Xiao, LI Xia.
Dynamic Model and Vibration Analysis of TBM Edge Disccutter
Based on MATLAB/Simulink
[J]. Tunnel Construction, 2020, 40(6): 833-839.
|
[6] |
XIAO Guangzhi.
Problems of Railway Tunnel Construction under Some Special Geological Conditions in China and Their Countermeasures
[J]. Tunnel Construction, 2019, 39(11): 1748-.
|
[7] |
ZHANG Jiangang, MENG Qingming, LI Wei, HE Chuan.
Mechanical Analysis of Segment Joints with Different Arrangement of Waterproof Sealing Gaskets
[J]. Tunnel Construction, 2019, 39(11): 1790-.
|
[8] |
GUAN Xiaojun, LI Chang, QIU Wenge, SHEN Zhijun, GONG Lun, WANG Gang.
Influence of Surrounding Rock Deterioration on Supporting Force of Deep Old Loess Tunnel
[J]. Tunnel Construction, 2019, 39(11): 1806-.
|
[9] |
LI Peng, LI Yang, GAO Yi, YU Shaohui, LI Yingfei.
Analysis and Research on Surface Deformation Law of Pipe Jacking Tunnel Constructed by Cut and Convert Method
[J]. Tunnel Construction, 2019, 39(11): 1838-1847.
|
[10] |
LI Yun, WANG Lichuan, XIAO Min, HU Li, PU Zijun.
Case Study on Prevention of Lining Cavity and Water Leakage of Yangjiawan Tunnel
[J]. Tunnel Construction, 2015, 35(12): 1331-1337.
|
[11] |
YANG Jihua, QI Sanhong, GUO Weixin, YANG Fengwei, LOU Guochuan.
Case Study on Engineering Geological Conditions and Problems in Construction of Headrace Tunnel of CCS Hydropower Station in Ecuador by TBM Method
[J]. Tunnel Construction, 2014, 34(6): 513-518.
|
[12] |
DIAO Jie-Yong.
Comments on Construction of Railway Tunnels in Gascontaining Ground
[J]. Tunnel Construction, 2011, 31(1): 82-87.
|
[13] |
YANG Jian-Zhang, Zhang-Wei, Chang-Jing-Guo.
Design and Practice of Comprehensive Lightning Prevention
of Tunnel Monitoring System
[J]. Tunnel Construction, 2011, 31(1): 144-148.
|
[14] |
XU Qing-Gao.
Settlement Control Technology Applied in Construction
of Largespan Metro Station Tunnel Crossing
Underneath Existing Metro Line
[J]. Tunnel Construction, 2010, 30(增刊1): 415-420.
|
[15] |
ZHANG Dong-Meng, ZHANG Yu, WANG Geng, WANG Yuan-Han.
Treatment and Utilization of Karst Caves during Construction of
Tunnels in Mountainous Areas
[J]. Tunnel Construction, 2010, 30(增刊1): 454-457.
|