ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2006, Vol. 26 ›› Issue (5): 56-59,73.DOI: B

• wenzhang • Previous Articles     Next Articles

Analysis on Cracks of Largescale Segments for Shielddriven Tunnels

SONG Shu-Xian   

  1. China Railway Tunnel Joint Stock Co., Ltd.
  • Received:2006-02-20 Revised:2006-06-20 Online:2006-10-20 Published:2010-04-16

Abstract:

On basis of the experience in the prefabrication of the largescale segments for the shielddriven Wuhan Yangtze River crossing tunnel, the paper presents the types of the cracks of the largescale segments, as well as the causes and countermeasures for the cracks. The paper places its emphasis on the description of the key technologies and critical technical processes of the prefabrication of the segments. The paper also presents the problems frequently encountered during the prefabrication of the segments and their prevention measures.

Key words: shield machine  , largescale segment crack  , cause

CLC Number: