ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2006, Vol. 26 ›› Issue (5): 79-81,96.DOI: B
• wenzhang • Previous Articles Next Articles
HE Zhen-Guo
Received:
Revised:
Online:
Published:
Abstract:
Taking a largescale earth/rock engineering works in Shenzhen as an example, the paper presents the calculation method for the equipment matching of an earth/rock engineering works. The paper places its emphasis on the expatiation of the matching principle and calculation method for the drilling equipment, excavating and loading equipment and transportation equipment. Furthermore, the paper makes comparisons between the production capability of theadopted matchingscheme and the quota data specified in the highway budget and municipal budget. The optimization of the equipment matching is of fundamental importance for the project to improve its production efficiency and reduce its engineering cost.
Key words: largescale  , earthrock engineering work  , equipment matching
CLC Number:
TU751
HE Zhen-Guo. Construction Equipment Matching of a Largescale Earth/rock Engineering Works in Shenzhen[J]. Tunnel Construction, 2006, 26(5): 79-81,96.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2006/V26/I5/79