Tunnel Construction ›› 2006, Vol. 26 ›› Issue (6): 48-51,65.DOI: B
• wenzhang • Previous Articles Next Articles
DAN Da-Jiang, Cheng-Hai-Jun
Received:
Revised:
Online:
Published:
Abstract:
The sewage tunnel project from Huilongguan East Station to Lishui Bridge Station crosses underneath the urban railways and national railways. Due to the complex geological conditions and rich ground water, high requirements are imposed on the subsidence control during construction and there exist great construction difficulties. By means of piperamming method, the construction quality and construction progress are effectively improved, the normal operation of the existing urban railways and the national railways are ensured and good economic efficiency is achieved. Furthermore, the piperamming method is more simple and more effective in guaranteeing the construction safety than the shallowburied undercutting method and pipejacking method. The auther presents the features and critical aspects of the piperamming construction, as well as the problems subject to occur during construction (such as direction deviations of the rammed pipes, ground surface subsidence and blocking) and the countermeasures.
Key words:  , piperamming construction technology  , deviation  , deviation correcting subsidence blocking  , countermeasure
CLC Number:
U455
DAN Da-Jiang, Cheng-Hai-Jun. PipeRamming Construction Technology for Sewage Tunnel Crossing Underneath Railways[J]. Tunnel Construction, 2006, 26(6): 48-51,65.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2006/V26/I6/48
Application Status and Analysis of Building Information Model (BIM) Technology in Tunnel Engineering
Dynamic Model and Vibration Analysis of TBM Edge Disccutter Based on MATLAB/Simulink