[1] |
ZHAO Yong, YU Zufa, CAI Jue, LYU Gang, LIU Jianyou, YUE Ling.
Design Concept and Implementation Path for Badaling
Great Wall Station of BeijingZhangjiakou Highspeed Railway
[J]. Tunnel Construction, 2020, 40(7): 929-940.
|
[2] |
LI Xiaojun, TIAN Yinxue, CHEN Shuwang, WANG Anmin.
Application Status and Analysis of Building
Information Model (BIM) Technology
in Tunnel Engineering
[J]. Tunnel Construction, 2020, 40(7): 953-0963.
|
[3] |
FENG Haibao, LIU Junwei, SU Changxi.
Analysis of Channel Dimensions for Immersed Tube
Element Towed by Selfpropelled Catamaran: a Case Study on
Immersed Tunnel of ShenzhenZhongshan
Link
[J]. Tunnel Construction, 2020, 40(6): 840-844.
|
[4] |
LIU Ze, WANG Yong, LI Xiaofeng, WU Zhihao.
Key Technologies for Type Selection and Application of
Doublemode TBM in Complex Geology of Sea Area
[J]. Tunnel Construction, 2020, 40(6): 868-872.
|
[5] |
ZHANG Binrong, GUAN Huisheng, TAN Xiaofeng, LIAO Jiang, YANG Xiao, LI Xia.
Dynamic Model and Vibration Analysis of TBM Edge Disccutter
Based on MATLAB/Simulink
[J]. Tunnel Construction, 2020, 40(6): 833-839.
|
[6] |
DU Chuangdong, ZHANG Jie, WU Yuebin.
Application of Construction Technology of "Tunneling First and Then Station"
in Tel Aviv Red Line Project in Israel
[J]. Tunnel Construction, 2020, 40(4): 562-568.
|
[7] |
JIANG Fuqiang, WANG Zimao.
New Technology of Sliding Formwork Integral Construction for Lining Structure of Rectangular Vertical Shaft
[J]. Tunnel Construction, 2019, 39(S2): 379-384.
|
[8] |
YU Shaohui, GAO Yi, LI Yang, CHENG Peng, WANG Quansheng.
Review and Prospect of Mechanized Construction Technology for Underground Engineering with Large Rectangular Crosssection
[J]. Tunnel Construction, 2019, 39(3): 451-458.
|
[9] |
XIAO Guangzhi.
Problems of Railway Tunnel Construction under Some Special Geological Conditions in China and Their Countermeasures
[J]. Tunnel Construction, 2019, 39(11): 1748-.
|
[10] |
ZHANG Jiangang, MENG Qingming, LI Wei, HE Chuan.
Mechanical Analysis of Segment Joints with Different Arrangement of Waterproof Sealing Gaskets
[J]. Tunnel Construction, 2019, 39(11): 1790-.
|
[11] |
GUAN Xiaojun, LI Chang, QIU Wenge, SHEN Zhijun, GONG Lun, WANG Gang.
Influence of Surrounding Rock Deterioration on Supporting Force of Deep Old Loess Tunnel
[J]. Tunnel Construction, 2019, 39(11): 1806-.
|
[12] |
LI Peng, LI Yang, GAO Yi, YU Shaohui, LI Yingfei.
Analysis and Research on Surface Deformation Law of Pipe Jacking Tunnel Constructed by Cut and Convert Method
[J]. Tunnel Construction, 2019, 39(11): 1838-1847.
|
[13] |
ZHANG Xuewen.
Countermeasures for Collapse of Taoshuping Tunnel Crossing Waterrich Finesand Strata
[J]. Tunnel Construction, 2018, 38(2): 308-315.
|
[14] |
YANG Shiwu, PI Sheng, SU Hui, MA Zhaofei.
Construction Technology of Micro Bench Method for Shallowcovered New Loess Tunnel
[J]. Tunnel Construction, 2017, 37(12): 1571-1577.
|
[15] |
YANG Jianmin.
Construction Technology and Application of Railway Tunnel Group in Loess: A Case Study of Zhangmao Large Crosssectional Tunnel
[J]. Tunnel Construction, 2016, 36(1): 113-122.
|