Tunnel Construction ›› 2008, Vol. 28 ›› Issue (1): 105-109.DOI: B

• wenzhang • Previous Articles     Next Articles

Translation and Reinforcement of Left Tgirder of Existing Wenfan
Bridge on WuKang Doubletrack Railway Project

SONG Haitao   

  1. The 2nd Engineering Co., Ltd. of China Railway Tunnel Group
  • Received:2007-09-03 Revised:2007-10-24 Online:2008-02-20 Published:2009-11-18

Abstract:

 A translation and reinforcement plan is proposed  for the left Tgirder of the existing Wenfan bridge on basis of the design and actual conditions of the job site. For the sake of construction of existing railway, the safetyguarantee measures, labor protection and equipment matching for the construction are also expounded.

Key words:  , existing bridgeTgirder translationreinforcementplan