ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2008, Vol. 28 ›› Issue (5): 561-565.DOI: A

• wenzhang • Previous Articles     Next Articles

Discussion on Rational and Rapid Mucking Transport Method

WEI Yanqing   

  1. Shanxi Provincial Research Institute of Communications
  • Received:2008-06-06 Revised:2008-08-08 Online:2008-10-20 Published:2009-11-25

Abstract:

The main methods of mucking in tunnel construction with drill and blast method is trackbound transportation system and trackless transportation. This paper mainly analyses the advantages and disadvantages of these two methods, the key factor of controlling mucking efficiency and machine matching principle of these two methods. Based on that, rational and rapid mucking transport method is discussed.

Key words:  , drill and blast method trackbound transportation system trackless transportationmechanical model choosing

CLC Number: