ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2008, Vol. 28 ›› Issue (5): 589-596.DOI: B

• wenzhang • Previous Articles     Next Articles

Summary of Control Survey Methods in Long Tunnel Construction

XU Hui   

  1. China Railway Tunnel Group Co., Ltd.
  • Received:2008-08-28 Revised:2008-09-09 Online:2008-10-20 Published:2009-11-25

Abstract:

 On basis of the network establishing theory of control survey in long tunnels, this paper presents the method of improving the survey precision and controlling the errors. Control network establishing and survey control by means of precise traversing method and GPS method are discussed in detailed. Furthermore, the general rules for estimating the holethrough error and control network adjustment are given. This paper can provide reference for survey control of long tunnels.

Key words:  , long tunnelsurvey and establishing networkerror control

CLC Number: