ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2008, Vol. 28 ›› Issue (5): 616-619,627.DOI: B

• wenzhang • Previous Articles     Next Articles

Construction Technology of Highway Tunnel Crossing Minedout Area

QIU Li-Qiu, WANG Pan-Hu   

  1. 1. Longyan Yongwu Highway Co., Ltd.2. Hangzhou Branch Company of China Railway Tunnel Group
  • Received:2008-04-24 Revised:2008-09-27 Online:2008-10-20 Published:2009-11-25

Abstract:

During the construction of Longjing tunnel on Yongwu highway, technical measures such as advance support by means of double layers of small pipes, sealing by shotcreting and rock bolting, backfilling by pumped concrete, enhanced support of tunnel body, installing cushion layers and monitoring measurement are taken for the minedout area. In the end, the tunnel passes the minedout area safely and successfully. These technical measures are presented in the paper, which can provide reference for similar works in the future.

Key words:  , highway tunnelminedout areaconstruction technology

CLC Number: