ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2008, Vol. 28 ›› Issue (6): 728-730.DOI: B

• wenzhang • Previous Articles     Next Articles

Application of Rotary Drilling Rig in Bored Pile Construction: Case Study
on No. 4 Contract Section of Line 3 of Guangzhou Metro

SHAO Jian-Li, CHEN Xia   

  1. 1. China Railway Tunnel Stock Co., Ltd.2. School of Architecture &|Civil Engineering, Liaocheng University
  • Received:2008-08-01 Revised:2008-09-16 Online:2008-12-20 Published:2009-12-02

Abstract:

The successful application of rotary drilling rigs in the bored pile construction in No. 4 contract section of the north extension part of line 3 of Guangzhou Metro fully confirms the superior performances of the rotary drilling rigs. The authors, on basis of their working experience, summarize the attention items and negative phenomena occurring in the boring construction and recommend some preventive measures. They hope this paper can provide reference for similar works in the future so as to make full use of the advantages of rotary drilling rigs.

Key words:  , rotary drilling rigboreholeconstruction technology

CLC Number: