Tunnel Construction ›› 2009, Vol. 29 ›› Issue (1): 72-75.DOI: B
• wenzhang • Previous Articles Next Articles
SHI Zhengyu
Received:
Revised:
Online:
Published:
Abstract:
Taking the construction of Baojiashan extralong Tunnel in waterrich stratum as an example, the author introduces the construction technology for tunnel in waterrich phyllite stratum in detail and develops a rapid construction technology in these geologic conditions, based on "construction technology of threebench and sevenstep parallel production with upward arc heading and core soil". The construction technology for tunnel in waterrich phyllite stratum is described in such aspects as selection of construction schemes and support parameters, determination of excavation methods and types of support system. Compared with the top bench tunnelling method and deformation control by largecross shapedsteel and anchoring cables usually used in tunnel excavation in phyllite stratum in China, the newly developed method combined construction technology of threebench and sevenstep parallel production and advance water controlling technology and radial water controlling technology, has such advantages as easy operation, easy conversion of construction method and rapid construction speed. The construction technology can provide references for similar projects in the future.
Key words:  , tunnelrich waterphyllite stratumrapidconstructiontechnology
CLC Number:
 
U 455
SHI Zhengyu. Rapid Construction Technology in Waterrich Phyllite Stratum in Baojiashan Extralong Tunnel[J]. Tunnel Construction, 2009, 29(1): 72-75.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2009/V29/I1/72
Application Status and Analysis of Building Information Model (BIM) Technology in Tunnel Engineering
Dynamic Model and Vibration Analysis of TBM Edge Disccutter Based on MATLAB/Simulink