Tunnel Construction ›› 2009, Vol. 29 ›› Issue (2): 176-180.DOI: A
• wenzhang • Previous Articles Next Articles
WANG Guanghui1, LI Zhiguo1, CHENG Xiaoming2, SONG Yan1
Received:
Revised:
Online:
Published:
Abstract:
Sand flowing is an important step in the construction of immersed tunnels. Simulation experiment is executed in order to obtain the relationship among the parameters and to verify the mixing proportion of the sand to be filled that has been originally designed. In case the sand is flowed through a single opening, the sand overflows under the bottom of the element except the four corners and the sand pancake has smooth and compact surface. In case the sand is flowed through two openings, the area where sand flowing is made earlier develops better and the sand pancake expands fully. The developments of sand pancake with different mixing proportions vary. Under the same sand flowing pressure, the higher the sand content, the smaller the diffusion radius becomes. The experiment demonstrates that the loadbearing capacity and compactness of the sand foundation can satisfy the design requirements completely, the compactness of the sand pancakes vary depending on the mixing proportions and the compactness at the edges of the sand pancakes and dents is low.
Key words:  , immersed tunnelsand pancakedentdiffusion radiuscompactness
CLC Number:
 
U 455.46
WANG Guanghui, LI Zhiguo, CHENG Xiaoming, SONG Yan. Sand Flowing Experiment and Experiment Result Analysis: Case Study on ShengwudaoDaxuecheng Immersed Tunnel[J]. Tunnel Construction, 2009, 29(2): 176-180.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/A
http://www.suidaojs.com/EN/Y2009/V29/I2/176
Application Status and Analysis of Building Information Model (BIM) Technology in Tunnel Engineering
Dynamic Model and Vibration Analysis of TBM Edge Disccutter Based on MATLAB/Simulink