ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2009, Vol. 29 ›› Issue (3): 334-338.DOI: B

• wenzhang • Previous Articles     Next Articles

Selection of Trackbound Transportation Equipments in Inclined Shaft and
Matching Techniques for Trackless Transportation in Main Tunnel

ZHANG Xuegang   

  1. China Railway Tunnel Stock Co., Ltd
  • Received:2008-12-22 Revised:2009-04-03 Online:2009-06-20 Published:2009-09-08

Abstract:

The author presents the matching techniques for the construction of Baojiashan tunnel on Xiaokang section of BaotouMaoming expressway through No.3 inclined shaft in this paper, including trackbound transportation equipment selection, transition from trackless transportation of mucks to trackbound transportation, transition from trackbound transportation of construction materials to trackless transportation, muck dumping system and pumping and drainage system. With the development of long tunnels in China, construction of main tunnels through steep inclined shaft is becoming popular. Study on such construction matching techniques can provide reference for construction of similar projects.

Key words:  , inclined shafttrackbound transportationmuck dumping systemequipment selectionmatching technique

CLC Number: