ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2009, Vol. 29 ›› Issue (4): 466-469.DOI: B

• wenzhang • Previous Articles     Next Articles

Treatment Technology of Mud and Water Gushing in F21 Fault of Dananshan Tunnel on XiamenShenzhen Railway

PU Xiaoping1, WANG Quansheng2   

  1. 1 The 3rd E2. Scientific Research Institute of China Railway Tunnel Group Co., Ltdngineering Co., Ltd. of China Railway Tunnel Group
  • Received:2008-04-15 Revised:2009-07-07 Online:2009-08-20 Published:2010-04-20

Abstract:

 Mud and water gushing happened during the construction in DK262 +411 section of F21 fault in Dananshan tunnel on XiamenShenzhen Railway with the water gushing volume being 60m3/h. The dominant ground in that section is fault breccia consisting of granite, quartzite and diabase, which is subject to becoming mud when water is encountered and has poor stability. A groutstopping wall is designed according to the site conditions and fullface grouting technology, with the grouting boreholes being drilled from the upper semisection, is applied in the tunnel construction to seal off the water and strengthen the ground, which ensures safe tunnelling through the fault section.

Key words:  , fault fracture zone mud and water gushingdesign of groutstopping walleffect evaluation

CLC Number: