ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2009, Vol. 29 ›› Issue (增刊2): 157-162,183.DOI: B

• wenzhang • Previous Articles     Next Articles

Construction Technology for Service Tube of Xiang’an
Subsea Tunnel in Xiamen Crossing F1 Deep Weathered Slot

JING Yong-Jun   

  1. China Railway Tunnel Stock Co., Ltd., Zhengzhou 450003, China
  • Received:2009-06-29 Revised:2009-09-01 Online:2009-09-30 Published:2010-01-04

Abstract:

The construction of subsea tunnels crossing deep weathered slot is unprecedented in China. Geology forecasting technology, monitoring and measurement technology, advance full face deephole grouting technology, advance pipe roof reinforcement technology and other assistant construction technologies are adopted, after 9month research and practice, for the construction of the service tube of Xiang'an subsea tunnel in Xiamen crossing  F1 deep weathered slot. In addition, NATM (New Austrian Tunneling Method) is strictly implemented during excavation and support. Owing to all the above measures, the 90mlong F1 subsea deep weathered slot, which has great risks, is conquered. The construction technology of the service tube crossing F1 subsea deep weathered slot is presented in the paper, which can provide reference for similar projects in the future.

Key words: sub sea tunnel, deep weathered slot, geology forecasting, monitoing and measurement, assistant construction technology, "top heading and bench", excavation method

CLC Number: