Key Construction Technology for Water rich Fully highly Weathered Sandstone Section of Xingwangmao Tunnel

JU Chong1, YOU Xian-Meng2, WANG Jun-Chao3   

  1. (1. China Railway Tunnel Group Co., Ltd., Luoyang 471009, Henan, China;2. Project Management Department of TaiZhongYing Railway, China Railway Tunnel Group Co., Ltd., Jingbian 718500, Shanxi, China;3. The 2nd Engineering Co., Ltd. of China Railway Tunnel Group, Sanhe 065201, Hebei, China)
  • Received:2009-12-17 Revised:2010-01-25 Online:2010-02-20 Published:2010-05-11

Abstract:

Such key technologies as excavation technology, controlled blasting technology, watersealing grouting technology and mud inflow treatment technology adopted in the construction of the waterrich fullyhighly weathered sandstone section of Xingwangmao tunnel are expatiated in the paper. "Top heading + 2 benches" 6step method adopted ensures the tunneling safety, controlled blasting technology adopted ensures proper protection of the surrounding ground; the watersealing grouting technology adopted ensures cuttingoff the seepage path and the mud inflow treatment technology adopted ensures proper tunnelling advance.

Key words: "top heading + 2 benches", 6step method, controlled blasting, fissure water, grouting, mud inflow