| [1] |
.
Interaction Load Between Rock and Super-Large
Diameter Slurry Shield Based on Data-Driven Method
[J]. Tunnel Construction, 2025, 45(4): 677-686.
|
| [2] |
WANG Chaofeng, WANG Guo′an, WANG Kai.
Design and Application of Real-time
Monitoring System for Load of Cutter Replacement
Device under Atmospheric Pressure of Extra-Large Diameter Slurry Shield
[J]. Tunnel Construction, 2021, 41(8): 1404-.
|
| [3] |
WEI Xiaolong, LIN Fulong, MENG Xiangbo, ZHOU Shuliang, GUO Junke.
Real Time Diagnosis Application of Disc
Cutter in Super Large Diameter Slurry Shield: a Case Study on Shantou Su′ai
Tunnel
[J]. Tunnel Construction, 2021, 41(5): 865-870.
|
| [4] |
RAN Haijun, ZHANG Wenxin, NIU Zhanwei, PENG Qi, XIANG Yixiong, LI Yuntao, GAO Guangyi.
Application and Analysis of Singlelayer
Fiberglass Mesh in Reception of Super large Diameter Shield: a Case
Study on Shield
Tunnel of Su′ai Channel
[J]. Tunnel Construction, 2020, 40(S2): 233-240.
|
| [5] |
WANG Famin, SUN Zhenchuan, ZHANG Lianghui, LI Fengyuan, ZHANG Bing, WANG Guo′an.
Design of Super-large Diameter Slurry Shield Used in Shantou Bay Tunnel and Construction Countermeasures for Unfavorable Geology
[J]. Tunnel Construction, 2020, 40(5): 735-746.
|
| [6] |
HUANG Zhigao, CHEN Peng, HE Yuanfu, LIU Gang, ZHU Xiaotian.
Load and Torque Calculation and Mechanical Performance Analysis of Cutterhead of a 12 m Slurry Shield
[J]. Tunnel Construction, 2019, 39(6): 1021-1029.
|
| [7] |
LI Ming, WU Bo, LI Chunfang.
Fuzzy Comprehensive Evaluation for Safety of Surrounding Buildings of Deep Foundation Pit
[J]. Tunnel Construction, 2018, 38(S1): 58-66.
|
| [8] |
CHEN Jian.
Research on Disc Cutter and Gear Cutter Replacement Technology forLarge Diameter Slurry Shield under Atmospheric Pressure in Composite Strata
[J]. Tunnel Construction, 2018, 38(S1): 175-181.
|
| [9] |
LI Fangming, CHEN Guoxing.
Study of Ground Surface Settlement of Foundation Pit with Suspended Waterproof Curtain in Yangtze River Floodplain
[J]. Tunnel Construction, 2018, 38(1): 33-40.
|
| [10] |
ZHAO Wen, DONG Jiachao, JIA Pengjiao, SHI Jianjun, XIAO Junhang, LIU Qiang.
Study of Construction Technology of Steel Tube Slab Structure for Mined Metro Station
[J]. Tunnel Construction, 2018, 38(1): 72-79.
|
| [11] |
]LIN Xiong, WEI Gang.
Safety Assessment of Underground Pipelines when Parallel to or Cross Tunnel during Shield Tunneling
[J]. Tunnel Construction, 2017, 37(S2): 154-160.
|
| [12] |
YANG Zhao, SUN Guohua, YANG Qing.
Key Technologies for Receiving of Superlarge Diameter Slurry Shield
[J]. Tunnel Construction, 2017, 37(S1): 116-120.
|
| [13] |
ZOU Jinjie, CHEN Gang, GAN Penglu, SHEN Yaojian.
Analysis of Ground Surface Settlements Induced by Construction of Shallowcovered Mined Tunnel in Waterrich and Softweak Strata: A Case Study of Zizhi Tunnel in Hangzhou
[J]. Tunnel Construction, 2017, 37(2): 141-149.
|
| [14] |
YE Zhi, LIU Huabei, LIU Wen.
Analysis of Influence of Water Inrush at Shield Tunneling Face on Ground Surface Settlement and Internal Stress of Segment
[J]. Tunnel Construction, 2017, 37(10): 1276-1286.
|
| [15] |
GAO Dongqi, LIAO Shaoming, ZHANG Di, MEN Yanqing.
Analysis of Monitoring of Large Diameter Slurry Shield Tunnel Crossing Underneath Highspeed Railway Bridge and Culvert: Case Study on North Huancheng Road Underground Expressway in Hangzhou
[J]. Tunnel Construction, 2016, 36(4): 403-410.
|