Comparison and Contrast between CRD Method and Roof Ripping Method:
Case Study on Construction of Junction Section between Access
Tunnel and Main Tunnel
JIN Bao
Ji’nan Urban Construction Group Co., Ltd., Ji’nan 250000, China
JIN Bao. Comparison and Contrast between CRD Method and Roof Ripping Method:
Case Study on Construction of Junction Section between Access
Tunnel and Main Tunnel[J]. Tunnel Construction, 2010, 30(6): 701-705.