ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2011, Vol. 31 ›› Issue (1): 42-46.
• wenzhang • Previous Articles Next Articles
ZHANG Heng-Hui, Wei-Meng-Yang, Shang-Xian-Gao
Received:
Revised:
Online:
Published:
Abstract:
In order to shorten the schedule of norm determination, the methods to determine the norm of mucking through inclined shafts by belt conveyors are optimized, and necessary procedures and related principles, such as subitem division, sample selection, model establishing and calculation, are set up. The methods can be applied in the quick determination of the norms of independent single construction procedures.
Key words: inclined shaft, belt conveyor, mucking norm, determination
ZHANG Heng-Hui, Wei-Meng-Yang, Shang-Xian-Gao. Determination of Norm of Mucking through Inclined Shaft by Belt Conveyor[J]. Tunnel Construction, 2011, 31(1): 42-46.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/
http://www.suidaojs.com/EN/Y2011/V31/I1/42