| [1] |
ZHANG Dongmei, GAN Binlin, SHEN Yiyao, HUANG Zhongkai, ZHANG Guiyang, ZHANG Wei.
A Systematic Review of Disturbance Effects and Control for Existing Shield Tunnels Induced by Adjacent Construction
[J]. Tunnel Construction, 2025, 45(S2): 11-29.
|
| [2] |
ZHANG Zhiguo, WAN Qimeng, LI Junjie, NI Yin, JIA Haoran, WEI Jian.
Impact of Deep Foundation Pit Excavation on Existing Metro Stations in Rheological Soft Strata and Reinforcement Effects: A Case Study of Shanghai Jinqiao Metro Over-Track Project
[J]. Tunnel Construction, 2025, 45(S2): 97-106.
|
| [3] |
CAO Xiaoyong, ZHANG Menghan, XI Weizheng, XU Ping, YE Fei, HAN Xingbo.
Corrugated Steel Support Design for Highway Tunnel
Shafts: A Case Study of Yinggeling Tunnel
[J]. Tunnel Construction, 2025, 45(S1): 182-192.
|
| [4] |
HAN Kaihang, LI Yansong, CHEN Xiangsheng, BAO Xiaohua, JIN Yinfu, SU Dong, ZHAO Xiaofeng, CHEN Weitao, JIANG Xi.
Deformation Impact Mechanism and Curtain Barrier Effect of a Super-Large-Diameter Shield Tunnel Crossing Beneath Existing Underground Structural Clusters
[J]. Tunnel Construction, 2025, 45(11): 2018-2032.
|
| [5] |
RUAN Hengfeng, LIANG Rongzhu, KANG Cheng, LI Zhongchao, CAO Shi′an, DING Zhi.
Elaborate Numerical
Modeling of Metro Shield Tunnel Structure Deformation
Induced by Lateral Foundation Pit Excavation
[J]. Tunnel Construction, 2024, 44(S2): 245-255.
|
| [6] |
SUN Xianghui, DONG Zilong, ZHAO Xiaolong, PEI Shengping.
Key Construction Techniques for LargeScale
Transfer Nodes Renovation of Existing Metro Hub
Stations
[J]. Tunnel Construction, 2023, 43(S2): 523-534.
|
| [7] |
KONG Yueyue, WAN Qiwei, DING Haibin, ZHOU Yuelong, HUANG Zhanjun, XU Changjie.
Optimal Design of DoubleBraced
Supporting Structure in Asymmetric Excavation
[J]. Tunnel Construction, 2023, 43(S1): 356-364.
|
| [8] |
WEI Gang, GUO Binglai, WU Haifeng, WANG Zhe, CHEN Bo, SUN Bo.
Measurement Analysis of Multi-Divisional
Foundation Pit Excavation and Deformation of Adjacent
Shield Tunnel
[J]. Tunnel Construction, 2023, 43(8): 1316-1326.
|
| [9] |
WEI Desheng, LINGHU Yan, RUAN Lei.
Influence of Construction Timing of Shield Receiving
End Structure on Shield Receiving Construction
[J]. Tunnel Construction, 2022, 42(S1): 19-27.
|
| [10] |
LI Yongyun, ZHONG Xiaochun, HE Chunhao, CHEN Jie, WANG Ziyi.
Influence of Rectangular Pipe Jacking Construction on
Adjacent Foundation Piles under ShallowBuried Soil
[J]. Tunnel Construction, 2022, 42(S1): 205-211.
|
| [11] |
YUAN Congcong, YUAN Zongyi, ZHAN Gangyi, XU Changjie, SHI Yufeng, GONG Honghua.
Cantilevered Inclined LongShortPiles Support Performance Model
for Sandy Soil Strata
[J]. Tunnel Construction, 2022, 42(4): 664-671.
|
| [12] |
LIU Linsheng, LI Yang, LI Weiteng, LI Yongshun, WANG Ke.
Prestress Effect of End Anchor Bolt in Mined Metro
Station
[J]. Tunnel Construction, 2021, 41(S2): 255-260.
|
| [13] |
GUO Zhi, QU Qiufen, FAN Zhiguo, LIU Guitao, LU Xiaofeng, GONG Yinglei.
Construction Technology Innovation of Double-Shield
Tunnel Boring -Machine in Qingdao Metro Line 1
[J]. Tunnel Construction, 2021, 41(8): 1385-.
|
| [14] |
KONG Qian, YANG Rui.
Influence of Delayed Steel Support on Support System
of Foundation Pits
[J]. Tunnel Construction, 2021, 41(12): 2113-2120.
|
| [15] |
WANG Zhijie, LI Zhen, CAI Libin, LI Hengyi, XU Haiyan.
Research on Application Technology of Steel Support
Servo System
for Foundation Pit
[J]. Tunnel Construction, 2020, 40(S2): 10-22.
|