| [1] |
HU Shixin, ZHANG Xiaowei, MENG Xin, XUE Peng, XIE Jingchao, LIU Jiaping.
Coupled Evaluation and Application of Green and Low-Carbon
Urban Rail Transit
[J]. Tunnel Construction, 2025, 45(S1): 146-157.
|
| [2] |
DAI Zhiren, ZHANG Shasha, LI Guoliang, ZOU Weilie, LI Mingyu, JIA Jianwei, YE Fei, YANG Zhiquan, HAN Xue.
Surface Collapse Mechanism Induced by Rail Transit Underground Engineering and Corresponding Countermeasures
[J]. Tunnel Construction, 2025, 45(8): 1451-1458.
|
| [3] |
REN Bineng.
Design Method for Integrating and Constructing Long-Distance
Shared Routes Between Underground Metro Lines and Municipal
Bridges
[J]. Tunnel Construction, 2024, 44(11): 2251-2256.
|
| [4] |
YANG Xiaoqiang, SUN Zhenyue.
Application Status and Research Prospect of Green
Technology in Xi′an Urban Rail Transit
[J]. Tunnel Construction, 2023, 43(S1): 1-5.
|
| [5] |
DONG Huazhen, NEI Cen, ZHOU Wei, WANG Zhonglin.
Optimization of Plane Obstacle Avoidance in
Underground Section of Urban Rail Transit Based on Improved
Particle Swarm Optimization
[J]. Tunnel Construction, 2023, 43(S1): 337-343.
|
| [6] |
YU Jianwei, XING Peng, WANG Haode, LIANG Bo, LI Qingyang.
Exploration and Application of Green and LowCarbon Technology of Xi′an Rail
Transit
[J]. Tunnel Construction, 2022, 42(S2): 6-12.
|
| [7] |
YU Shangyu.
Forward Design and Application of Building Information
Modeling in Shenzhen
Huangmugang Comprehensive Transportation Hub Project
[J]. Tunnel Construction, 2021, 41(S2): 390-397.
|
| [8] |
AI Yongfei, WU Baoyou, AI Yonglin, XU Yinfei.
Construction Technology of Prefabricated Slab Track
under Trackless Tooling
Mode: a Case Study of Suzhou Rail Transit Line 5
[J]. Tunnel Construction, 2021, 41(S2): 597-604.
|
| [9] |
ZENG Ke.
Design of Long and Steep Slope Section from Aerospace
City to East Chang′an Street of Xi′an Metro Line 15
[J]. Tunnel Construction, 2021, 41(S1): 323-.
|
| [10] |
ZHANG Wenzheng.
Comparative Study on Types of Return Lines of Urban
Rail Transit
[J]. Tunnel Construction, 2020, 40(S1): 270-277.
|
| [11] |
LU Bin, JIANG Tao, WANG Shugang, LIU Shilei, YIN Long, ZHAI Kangbo.
Prediction and Analysis of Internal Air Temperature during Operation Period of Tunnel
[J]. Tunnel Construction, 2020, 40(4): 597-602.
|
| [12] |
ZHOU Nianqing, YANG Haobo, YANG Lei, LIU Xianlin.
Application of EVS Coupled StratigraphicLithologic Threedimensional Geological Modeling Method in Nanning Metro Project
[J]. Tunnel Construction, 2020, 40(2): 238-245.
|
| [13] |
WANG Jianhong, XIE Quanyi, LIU Jian, KOIZUMI Atsushi.
Research on Diseases and Current Situation of
Operation Maintenance Management of Japanese Railway
Tunnels and Suggestions
[J]. Tunnel Construction, 2020, 40(12): 1824-1833.
|
| [14] |
YANG Quanrong, WANG Yu, HE Yuechuan.
Integration Application of a Construction Monitoring System of Urban Rail Transit Based on BIM and GIS
[J]. Tunnel Construction, 2019, 39(S2): 345-351.
|
| [15] |
SUN Xibo, ZHANG Bo, ZHANG Zhiwei.
Study of BIM Overall Management of Urban Rail Transit Project
[J]. Tunnel Construction, 2019, 39(S1): 50-56.
|